Skip to main content
Skip to content
Case File
d-13865Dept. of JusticeFlight Log

Pilot's Flight Log: doj-ogr-00016015

This is a pilot's flight log detailing various flights on B-727 and G-1159B aircraft between February 12 and March 10, 2003. The log includes information on flight routes, passengers, and crew members. The pilot, David Ledefus, certifies the accuracy of the log.

Date
Unknown
Source
Dept. of Justice
Reference
File: doj-ogr-00016015
Pages
1
Persons
4
Integrity
No Hash Available

Summary

This is a pilot's flight log detailing various flights on B-727 and G-1159B aircraft between February 12 and March 10, 2003. The log includes information on flight routes, passengers, and crew members. The pilot, David Ledefus, certifies the accuracy of the log.

This document is from the epstein-docs Archive.

View Source Collection
Browse epstein-docs ArchiveFile: doj-ogr-00016015
0Share
PostReddit

Related Documents (6)

Dept. of JusticeFlight LogUnknown

Pilot's Flight Log: DOJ-OGR-00016009

This document is a pilot's flight log for David Redfern, detailing his flights between June 8 and an unspecified date in 2002. The log includes information on aircraft type, flight routes, crew members, and the number of landings. The pilot certifies the accuracy of the information recorded.

1p
DOJ Data Set 10OtherUnknown

EFTA01835674

1p
DOJ Data Set 10CorrespondenceUnknown

EFTA Document EFTA01954726

0p
DOJ Data Set 9OtherUnknown

Rough Notes/Punch List from January 6, 2019 meeting on LSJ

Rough Notes/Punch List from January 6, 2019 meeting on LSJ JE, and attending 1. Confirm turbo charger for lull was on plane — confirmed. sent picture. 2. order new lull 3. order new dump truck 4. order new fuel truck 5. order new flat bed 6. order new tractor 7. order new hydro seeder 8. order new man lift 9. order new push lawn mower 10. order new roller 11. order new trencher 12. order new larger fertilizer sprayer 13. order hydraulic hose machine 14. order tire changer for commercial vehicles 15. order new jet ski 16. Confirm condition of most recently purchased tractor and what needs to be done to it to make it fully operable. 17. Nautica and Sportis are both to be ready by January 30, 2019 18. Little C scheduled for refit and cleanup to take approx 2 weeks and to start once Nautica and Sportis are back up and running — est. to start by Feb 1. 19. new barge that is wider to accommodate two concrete trucks EFTA00259015 20. barge and "Bu

22p
DOJ Data Set 10OtherUnknown

EFTA02193696

5p
DOJ Data Set 10CorrespondenceUnknown

EFTA Document EFTA01651627

0p

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.