Skip to main content
Skip to content
Case File
dc-4385524Court Unsealed

NYSDOT Adv 6.26.17 -7.2.17

STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 RELEASE: IMMEDIATE 6/23/2017 CONTACT: Diane Park (718)482-4526 ***** T R A F F I C A D V I S O R Y ***** All lane closures listed are expected to be in place, WEATHER PERMITTING: Bronx Bronx River Parkway 6/26/2017 – 6/30/2017 (NEW THIS WEEK) • One lane closed N/B from Cross Bronx Expressway to City Line from 10:00 a.m. to 2:00 p.m. • One lane closed S/B from City Line to Story Avenue from 10:00 a.m. to 2:00 p.m. D262995 (Wokoun) Bruc

Date
February 22, 2018
Source
Court Unsealed
Reference
dc-4385524
Pages
20
Persons
0
Integrity
No Hash Available

Summary

STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 RELEASE: IMMEDIATE 6/23/2017 CONTACT: Diane Park (718)482-4526 ***** T R A F F I C A D V I S O R Y ***** All lane closures listed are expected to be in place, WEATHER PERMITTING: Bronx Bronx River Parkway 6/26/2017 – 6/30/2017 (NEW THIS WEEK) • One lane closed N/B from Cross Bronx Expressway to City Line from 10:00 a.m. to 2:00 p.m. • One lane closed S/B from City Line to Story Avenue from 10:00 a.m. to 2:00 p.m. D262995 (Wokoun) Bruc

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 RELEASE: IMMEDIATE 6/23/2017 CONTACT: Diane Park (718)482-4526 ***** T R A F F I C A D V I S O R Y ***** All lane closures listed are expected to be in place, WEATHER PERMITTING: Bronx Bronx River Parkway 6/26/2017 – 6/30/2017 (NEW THIS WEEK) • One lane closed N/B from Cross Bronx Expressway to City Line from 10:00 a.m. to 2:00 p.m. • One lane closed S/B from City Line to Story Avenue from 10:00 a.m. to 2:00 p.m. D262995 (Wokoun) Bruckner Expressway 6/23/2017 – 6/24/2017 D262631 (Cabrera) • One or two lanes closed N/B between Country Club Road and Westchester Avenue from 11:00 p.m. to 2:00 p.m. • One or two lanes closed E/B between Edgewater Road and Bronx River Avenue from 11:00 p.m. to 2:00 p.m. • One or two lanes closed Both Directions between White Plains Road and Bronx River Parkway from 10:00 p.m. to 2:00 p.m. • One or two lanes closed Both Directions between White Plains Road and Castle Hill Avenue from 10:00 p.m. to 2:00 p.m. 6/26/2017 – 6/29/2017 • One lane closed N/B between Calhoun Avenue and Hollywood Avenue from 9:00 a.m. to 2:00 p.m. • One lane closed S/B between Hollywood Avenue and Calhoun Avenue from 10:00 a.m. to 3:00 p.m. • One lane closed N/B between Country Club Road and Westchester Avenue from 10:00 a.m. to 2:00 p.m. • One lane closed S/B between Westchester Avenue and Country Club Road from 10:00 a.m. to 3:00 p.m. 6/26/2017 – 6/30/2017 • One or two lanes closed Both Directions between White Plains Road and Bronx River Parkway from 10:00 p.m. to 5:00 a.m. • One or two lanes closed E/B between Edgewater Road and Bronx River Avenue from 10:00 p.m. to 5:00 a.m. • One lane closed S/B between Evergreen Avenue and Bronx River Avenue from 10:00 p.m. to 5:00 a.m. • One or two lanes closed Both Directions between Calhoun Avenue and Hollywood Avenue from 10:00 p.m. to 5:00 a.m. • One or two lanes closed N/B between Country Club Road and Westchester Avenue from 10:00 p.m. to 5:00 a.m. • One or two lanes closed Both Directions between White Plains Road and Castle Hill Avenue from 10:00 p.m. to 5:00 a.m. 6/28/2017 – 6/29/2017 D031434 (Haks) • One to two lanes closed E/B between Zerega Avenue and Balcom Avenue from 11:00 p.m. to 5:00 a.m. Cross Bronx Expressway 6/24/2017 • One or two lanes closed Both Directions at Webster Avenue from 12:01 a.m. to 7:00 a.m. 6/26/2017 – 6/28/2017 • Right lane closed N/B ramp to N/B Bruckner Expressway from 10:00 a.m. to 3:00 p.m. 6/26/2017 – 6/30/2017 • One or two lanes closed S/B between Boston Road and Arthur Avenue from 10:00 p.m. to 6:00 a.m. • One or two lanes closed N/B between Arthur Avenue and Boston Road from 11:00 p.m. to 6:00 a.m. • One or two lanes closed S/B between Webster Avenue and Macombs Road from 10:00 p.m. to 6:00 a.m. • One lane closed N/B between Sheridan Expressway and Rosedale Avenue from 11:00 p.m. to 6:00 a.m. • One lane closed S/B between Rosedale Avenue and Sheridan Expressway from 10:00 p.m. to 6:00 a.m. 6/26/2017 – 6/30/2017 • One or two lanes closed Both Directions at Webster Avenue from 11:00 p.m. to 6:00 a.m. 6/29/2017 – 6/30/2017 • Right lane closed N/B at Park Avenue from 11:00 p.m. to 6:00 a.m. D262267 (Okwuoha) D031434 (Haks) D262631 (Cabrera) D262267 (Okwuoha) D263106 (Ledlon) Bronx (continued) Henry Hudson Parkway 6/27/2017 • Moving lane closure Both Directions between Mosholu Avenue and Broadway from 10:00 a.m. to 3:00 p.m. D031434 (Haks) Major Deegan Expressway Traffic Pattern: D262391 (Aristy) • A New Traffic Pattern is in place on the S/B Major Deegan Expressway near the Macombs Dam Bridge. All three lanes are shifted to left. This pattern will be in placed until August 2017. Traffic Pattern: D262391 (Aristy) • A Traffic Pattern is in place on the N/B Major Deegan Expressway from 138 th Street to Macombs Dam Bridge, one (1) lane closed until November 2017. 6/23/2017 – 6/24/2017 D262631 (Cabrera) • One lane closed Both Directions between West 230th Street and West Fordham Road from 11:00 p.m. to 11:00 a.m. • One or two lanes closed S/B between Van Cortlandt Park South and East 233 rd Street from 10:00 p.m. to 6:00 a.m. • One or two lanes closed Both Directions between 138th Street and Third Avenue from 10:00 p.m. to 6:00 a.m. 6/26/2017 – 6/29/2017 D262391 (Aristy) • One lane closed S/B from East 138th Street to East 161st Street from 10:00 a.m. to 3:00 p.m. 6/26/2017 – 6/29/2017 D262631 (Cabrera) • One lane closed N/B between East 233rd Street and Mclean Avenue from 9:00 a.m. to 2:00 p.m. • One lane closed S/B between Van Cortlandt Park South and East 233 rd Street from 10:00 a.m. to 2:00 p.m. 6/26/2017 – 6/30/2017 • One lane closed Both Directions between West 230th Street and West Fordham Road from 10:00 p.m. to 6:00 a.m. • One or two lanes closed S/B between West Burnside Avenue and West 176 th Street from 10:00 p.m. to 5:00 a.m. • One or two lanes closed N/B between West 176th Street and West Burnside Avenue from 10:00 p.m. to 6:00 a.m. • One or two lanes closed N/B between East 233rd Street and Mclean Avenue from 10:00 p.m. to 6:00 a.m. • One or two lanes closed S/B between Van Cortlandt Park South and East 233 rd Street from 10:00 p.m. to 5:00 a.m. • One lane closed N/B between West 231st Street and West 234th Street from 10:00 p.m. to 5:00 a.m. • One lane closed S/B between West 234th Street and West 231st Street from 10:00 p.m. to 6:00 a.m. • One or two lanes closed Both Directions between 138 th Street and Third Avenue from 10:00 p.m. to 5:00 a.m. Sheridan Expressway 6/26/2017 – 6/29/2017 • One lane closed N/B between Aldus Street and East 172nd Street from 9:00 a.m. to 3:00 p.m. • One lane closed S/B between East 172nd Street and Aldus Street from 10:00 a.m. to 3:00 p.m. 6/26/2017 – 6/30/2017 • One lane closed Both Directions between Aldus Street and East 172 nd Street from 10:00 p.m. to 5:00 a.m. Bruckner Boulevard 6/26/2017 – 6/27/2017 • Right lane closed E/B between 135th Street and 138th Street from 10:00 a.m. to 3:00 p.m. D262631 (Cabrera) D031434 (Haks) Kappock Street 6/28/2017 D031434 (Haks) • One lane closure Both Directions between Independence Avenue and Arlinton Avenue from 10:00 a.m. to 3:00 p.m. Route 1 6/29/2017 – 6/30/2017 • Right lane closure Both Directions between Ropes Avenue and Heathcote Avenue from 10:00 a.m. to 3:00 p.m. 2 6/23/2017 D031434 (Haks) 1 Brooklyn Brooklyn Queens Expressway TRAVEL ADVISORY: OPENING OF NEW KOSCIUSZKO BRIDGE D900011 (Bowers) ► EASTBOUND AND WESTBOUND BQE TRAFFIC SHIFTED ONTO NEW BRIDGE • Motorists are advised that the New York State Department of Transportation has shifted the eastbound and westbound BrooklynQueens Expressway (BQE) traffic onto the New Kosciuszko Bridge. • Traffic entering the westbound BQE via ramps from the LIE and 43 rd Street is also shifted onto the New Kosciuszko Bridge. • Motorists are reminded that fines are doubled for speeding in a work zone. In accordance with the Work Zone Safety Act of 2005, convictions of two or more speeding violations in a work zone could result in the suspension of an individual’s driver license. It is imperative that motorists drive carefully through construction work zones, for their own safety and the safety of workers. • For up-to-date travel information, call 511 or visit www.511NY.org. • Follow New York State DOT on Twitter: @NYSDOT_NYC. Find us on Facebook at facebook.com/NYSDOT. 6/23/2017 - 6/24/2017 D900011 (Bowers) • One lane closed E/B from McGuinness Boulevard to Long Island Expressway Exit from 10:30 p.m. to 5:00 a.m. Note: Installation/testing Firestand pipe and downspout systems. 6/23/2017 – 6/24/2017 D262996 (Abouyousef) • One lane closed Both Directions from 5th Street to 3rd Street from 10:30 p.m. to 5:00 a.m. (Bridge Washing) 6/26/2017 - 6/30/2017 D900011 (Bowers) • One lane closed E/B from McGuinness Boulevard to Long Island Expressway Exit from 10:30 p.m. to 5:00 a.m. Note: Installation/testing Firestand pipe and downspout systems. Gowanus Expressway Traffic Pattern: D261302 (Rodriguez) • The Flyover ramp (left lane) of the E/B Gowanus Expressway is being used as the HOV lane from 6am to 10am. After the morning HOV lane hours, this lane will be use as an additional westbound lane between 56 th Street and Bay Ridge Parkway. In conjunction with the traffic configuration, the left lane of the westbound Gowanus Expressway between Ovington Avenue and Bay Ridge Parkway will be permanently closed. 6/23/2017 – 6/24/2017 D262963 (Rodriguez) • One lane closed Both Directions between 57th Street and 63rd Street from 10:00 p.m. to 1:00 a.m. • Two lanes closed Both Directions between 57th Street and 63rd Street from 1:00 a.m. to 5:00 a.m. Prospect Expressway 6/26/2017 – 6/27/2017 D262996 (Abouyousef) • One lane closed Both Directions over Gowanus Expressway from 10:00 p.m. to 5:00 a.m. (Bridge Washing) Bay Parkway 6/28/2017 • One lane closed B/D under Belt Parkway from 10:00 a.m. to 3:00 p.m. Cherry Street Traffic Pattern: • All lanes closed E/B between Porter Avenue and Scott Avenue (24 hour lane closure) Note: Construction of the New Kosciusko Bridge. Meeker Avenue 6/26/2017 – 6/29/2017 • One lane closed E/B from Kingsland Avenue to Vandervoort Avenue from 10:00 a.m. to 3:00 p.m. Note: Installation of drainage and landscaping. Ocean Parkway 6/26/2017 – 6/30/2017 • One or two lanes closed Both Directions from Avenue M to Murdock Ct. from 10:00 p.m. to 5:00 a.m. Note: Striping, Cleaning Catch Basins. Varick Avenue Traffic Pattern: • All lanes closed Both Directions from Thomas Street to Anthony Street (24 hour lane closure) Note: Roadway Reconstruction. 3 6/23/2017 D031433 (Weidlinger) D900011 (Bowers) D900011 (Bowers) D263289 (Diaz) D900011 (Bowers) 1 Brooklyn (continued) Grand Street 6/26/2017 – 6/27/2017 D262996 (Abouyousef) • One lane closed N/B over Brooklyn Queens Expressway from 10:00 p.m. to 5:00 a.m. (Bridge Washing) Woodhull Street 6/28/2017 D262996 (Abouyousef) • One lane closed N/B over Brooklyn Queens Expressway from 12:01 a.m. to 5:00 a.m. (Bridge Washing) 3rd Avenue 6/25/2017 • Left lane closed W/B from 38th Street to 39th Street from 9:00 a.m. to 3:00 p.m. 6/26/2017 – 6/30/2017 • Left lane closed Both Directions from 24th Street to 20th Street from 9:00 a.m. to 3:00 p.m. 7/1/2017 • Left lane closed W/B from 55th Street to 56th Street from 9:00 a.m. to 2:30 p.m. 65th Street 6/27/2017 – 6/28/2017 • Left lane closed E/B from 5th Avenue to 4th Avenue from 10:00 a.m. to 2:30 p.m. 6/29/2017 – 7/1/2017 • Left lane closed W/B from 4th Avenue to 5th Avenue from 9:00 a.m. to 2:30 p.m. 4 6/23/2017 D031430 (HNTB) D031430 (HNTB) 1 Manhattan Franklin D. Roosevelt Drive 6/28/2017 – 6/30/2019 • One lane closed Both Directions at East 83rd Street from 11:00 p.m. to 5:00 a.m. D031432 (B&H Engineering) Harlem River Drive 6/23/2017 – 6/24/2017 D262631 (Cabrera) • All lanes closed N/B ramp to 135th Street and Madison Avenue from 11:00 p.m. to 2:00 p.m. 6/26/2017 – 6/29/2017 • One lane closed N/B between West 155th Street and West 166th Street from 9:00 a.m. to 2:00 p.m. • One lane closed S/B between West 166th Street and West 155th Street from 10:00 a.m. to 3:00 p.m. • One lane closed N/B between Macombs Dam Bridge and West 166th Street from 9:00 a.m. to 2:00 p.m. • One lane closed N/B between West 139th Street and West 145th Street from 9:00 a.m. to 2:00 p.m. • One lane closed S/B between West 145th Street and West 139th Street from 10:00 a.m. to 3:00 p.m. 6/26/2017 – 6/30/2017 • All lanes closed N/B ramp at West 155th Street from 11:00 p.m. to 6:00 a.m. (NEW THIS WEEK) • All lanes closed N/B ramp to East 135th Street and Madison Avenue from 11:00 p.m. to 6:00 a.m. • One or two lanes closed S/B between West 166th Street and West 155th Street from 10:00 p.m. to 5:00 a.m. 6/28/2017 – 6/29/2017 D263398 (Mungo) th rd • Left lane closed N/B from 130 Street to 143 Street from 10:00 a.m. to 2:00 p.m. (Survey Work) • Left lane closed N/B from 154th Street to 164th Street from 10:00 a.m. to 2:00 p.m. (Survey Work) • Left lane closed N/B from 162nd Street to 171st Street from 10:00 a.m. to 2:00 p.m. (Survey Work) • Right lane closed S/B from 143rd Street to 130th Street from 10:00 a.m. to 2:00 p.m. (Survey Work) • Right lane closed S/B from 171st Street to 143rd Street from 10:00 a.m. to 2:00 p.m. (Survey Work) 6/28/2017 – 6/29/2017 D262996 (Abouyousef) • One lane closed Both Directions ramp to/from George Washington Bridge from 10:00 p.m. to 5:00 a.m. (Bridge Washing) 6/29/2017 – 6/30/2017 • One lane closed Both Directions from 139th Street to 142nd Street from 10:00 p.m. to 5:00 a.m. (Bridge Washing) Henry Hudson Parkway 6/26/2017 – 6/30/2017 • One lane closed N/B between West 125th Street and West 138th Street from 10:00 p.m. to 5:00 a.m. • One lane closed S/B between West 155th Street and West 125th Street from 10:00 p.m. to 5:00 a.m. D262631 (Cabrera) I-95 6/29/2017 – 6/30/2017 D262996 (Abouyousef) • One lane closed N/B ramp to Washington Bridge over Cross Bronx Expressway from 10:00 p.m. to 5:00 a.m. (Bridge Washing) 5 6/23/2017 1 Queens Brooklyn Queens Expressway 6/23/2017 - 6/24/2017 • One lane closed W/B from Queens Boulevard Entrance to Kingsland Avenue from 10:30 p.m. to 5:00 a.m. Note: Installation/testing Firestan pipe and downspout systems. • One lane closed E/B ramp to Long Island Expressway from 10:30 p.m. to 5:00 a.m. Note: Installation and Removal of Striping. 6/24/2017 • Two lanes closed W/B from Queens Boulevard Entrance to Kingsland Avenue from 12:01 a.m. to 6:00 a.m. Note: Installation and Removal of lighting and downspout system. 6/26/2017 - 6/30/2017 • One lane closed W/B from Queens Boulevard Entrance to Kingsland Avenue from 10:30 p.m. to 5:00 a.m. Note: Installation/testing Firestan pipe and downspout systems. • One lane closed E/B ramp to Long Island Expressway from 10:30 p.m. to 5:00 a.m. Note: Installation and Removal of Striping. 6/29/2017 • One lane closed W/B ramp to W/B Long Island Expressway from 10:00 a.m. to 3:00 p.m. Cross Island Parkway 6/23/2017 – 6/24/2017 • All lanes closed N/B ramp to W/B Grand Central Parkway from 10:00 p.m. to 5:00 a.m. D900011 (Bowers) D031431 (Stantec) D262761 (Forti) Grand Central Parkway 6/23/2017 – 6/24/2017 D262761 (Forti) • Right lane closed W/B between Union Turnpike and Little Neck Parkway from 10:00 p.m. to 1:00 a.m. • Two lanes closed W/B between Union Turnpike and Little Neck Parkway from 1:00 a.m. to 6:00 a.m. 6/23/2017 – 6/24/2017 D262699 (Patel) • Left lane closed W/B Service Road at Long Island Expressway Interchange from 10:00 p.m. to 6:00 a.m. • Left lane closed E/B Service Road at Long Island Expressway Interchange from 10:00 p.m. to 7:00 a.m. • One lane closed W/B from Jewel Avenue to Long Island Expressway Interchange from 10:00 p.m. to 12:01 a.m. • Two lanes closed W/B from Jewel Avenue to Long Island Expressway Interchange from 12:01 a.m. to 6:00 a.m. • One lane closed E/B from Zoo Bridge to Long Island Expressway Interchange from 10:00 p.m. to 12:01 a.m. • Two lanes closed E/B from Zoo Bridge to Long Island Expressway Interchange from 12:01 a.m. to 7:00 a.m. Note: Stage 4 Bridge Construction. 6/26/2017 – 6/29/2017 • Left lane closed W/B Service Road at Long Island Expressway Interchange from 10:00 a.m. to 3:00 p.m. • Left lane closed E/B Service Road at Long Island Expressway Interchange from 10:00 a.m. to 2:00 p.m. • Right lane closed W/B from Jewel Avenue to Long Island Expressway Interchange from 11:00 a.m. to 3:00 p.m. • Right lane closed E/B from Zoo Bridge to Long Island Expressway Interchange from 10:00 a.m. to 2:00 p.m. Note: Stage 4 Bridge Construction. 6/26/2017 – 6/30/2017 (NEW THIS WEEK) D261836 (Im) • One lane closed W/B from Union Turnpike to Rail Road Bridge from 10:00 a.m. to 2:00 p.m. • One lane closed E/B from Van Wyck Expressway S/B to Union Turnpike/Main Street from 10:00 a.m. to 2:00 p.m. 6/26/2017 – 6/30/2017 D263289 (Diaz) • One or two lanes closed Both Directions from Union Turnpike to City Line from 10:00 p.m. to 5:00 a.m. Note: Milling, Paving, Striping, Saw and Seal. 6/26/2017 – 6/30/2017 D262699 (Patel) • Left lane closed Both Directions Service Road at Long Island Expressway Interchange from 10:00 p.m. to 5:00 a.m. • One lane closed W/B from Jewel Avenue to Long Island Expressway Interchange from 10:00 p.m. to 12:01 a.m. • One lane closed E/B from Zoo Bridge to Long Island Expressway Interchange from 10:00 p.m. to 12:01 a.m. Note: Stage 4 Bridge Construction. 6/27/2017 – 6/30/2017 • Two lanes closed W/B from Jewel Avenue to Long Island Expressway Interchange from 12:01 a.m. to 5:00 a.m. • Two lanes closed E/B from Zoo Bridge to Long Island Expressway Interchange from 12:01 a.m. to 5:00 a.m. John F. Kennedy Expressway 6/29/2017 • One lane closed Both Directions at 150th Avenue from 10:00 a.m. to 3:00 p.m. 6 6/23/2017 D031431 (Stantec) 1 Queens (continued) Long Island Expressway Traffic Pattern: D262699 (Patel) • Starting Monday night, June 26th, 2017 at 10 p.m. (weather permitting), a New Traffic Pattern will be in place in both directions on the Long Island Expressway (LIE) mainline and service roads between the Grand Central Parkway (GCP) and Junction Boulevard in central Queens. The changes in traffic patterns will be implemented over several nights. This pattern will be in place until January 2018. • Westbound Long Island Expressway Mainline over the Grand Central Parkway: Traffic will be split on the westbound Long Island Expressway mainline over the Grand Central Parkway, with one lane to the left of a concrete barrier and two lanes to the right. All lanes will be through lanes. All lanes will be able to access Junction Boulevard at Exit 20. • Westbound Long Island Expressway Service Road to Exit for Westbound Grand Central Parkway: The right lane of the westbound Long Island Expressway service road will become an exit-only lane to the westbound Grand Central Parkway. The left lane will continue to be a through lane, providing access to the eastbound Grand Central Parkway, westbound Long Island Expressway and 108th Street. • Entrance to Westbound Long Island Expressway and Exit to Junction Blvd Starting near 108th Street Exit on Service Road: The entrance ramp to the westbound Long Island Expressway is being converted from one to two lanes, starting just before the exit for 108th Street on the westbound Long Island Expressway service road. The right travel lane will be an exitonly lane to Exit 20, Junction Boulevard. The left lane will merge with the westbound Long Island Expressway. • Fines are doubled for speeding in a work zone. In accordance with the Work Zone Safety Act of 2005, convictions of two or more speeding violations in a work zone could result in the suspension of an individual’s driver license. It is imperative that motorists drive carefully through this construction zone, for their own safety and the safety of workers. • For up-to-date travel information, call 511 or visit www.511NY.org. • Follow New York State DOT on Twitter: NYSDOT New York City (@NYSDOT_NYC) Twitter. • Find us on Facebook at http://facebbook.com/NYSDOT. 6/23/2017 – 6/24/2017 D262699 (Patel) • Left lane closed W/B Service Road from Grand Central Parkway to Colonial Avenue from 10:00 p.m. to 6:00 a.m. • Left lane closed W/B from College Point Boulevard to Grand Central Parkway from 10:00 p.m. to 6:00 a.m. 6/24/2017 • Right lane closed E/B Service Road from Colonial Avenue to Grand Central Parkway from 12:01 a.m. to 6:00 a.m. • Left lane closed E/B from Grand Central Parkway to College Point Boulevard from 12:01 a.m. to 7:00 a.m. 6/26/2017 – 6/30/2017 • Right lane closed E/B Service Road from Colonial Avenue to Grand Central Parkway from 11:00 p.m. to 6:00 a.m. • Left lane closed W/B Service Road from Grand Central Parkway to Colonial Avenue from 10:00 p.m. to 5:00 a.m. • Left lane closed W/B from College Point Boulevard to Grand Central Parkway from 10:00 p.m. to 5:00 a.m. • Left lane closed E/B from Grand Central Parkway to College Point Boulevard from 11:00 p.m. to 6:00 a.m. Note: Stage 4 Bridge Construction. 6/26/2017 – 6/30/2017 D900011 (Bowers) • One lane closed W/B ramp to W/B Brooklyn Queens Expressway from 10:30 p.m. to 5:00 a.m. Note: Installation and Removal of Striping. 6/27/2017 D031431 (Stantec) • One lane closed Both Directions at Junction Boulevard from 10:00 a.m. to 3:00 p.m. 6/28/2017 • One lane closed Both Directions at 108th Street from 10:00 a.m. to 3:00 p.m. 6/29/2017 • One lane closed E/B ramp to S/B Van Wyck Expressway from 10:00 a.m. to 3:00 p.m. 6/28/2017 – 6/29/2017 • One lane closed Both Directions between Oceania Street and Clearview Expressway from 10:00 a.m. to 3:00 p.m. Van Wyck Expressway 6/26/2017 – 6/30/2017 D261836 (Im) • One lane closed S/B from 72nd Avenue (Pedestrian Bridge) to Hoover Avenue from 10:00 a.m. to 2:00 p.m. • One lane closed S/B from 72nd Avenue (Pedestrian Bridge) to Hoover Avenue from 11:59 p.m. to 5:00 a.m. 6/26/2017 – 6/30/2017 D262367 (Pizzitola) • Left lane closed S/B between Northern Boulevard and Roosevelt Avenue from 7:00 a.m. to 3:30 p.m. • Right lane closed N/B between Roosevelt Avenue and Northern Boulevard from 7:00 a.m. to 3:30 p.m. (NEW THIS WEEK) 7 6/23/2017 1 Queens (continued) College Point Boulevard 6/26/2017 – 6/30/2017 D262699 (Patel) • Right lane closed Both Directions from Horace Harding Expressway East to Horace Harding Expressway West from 9:00 a.m. to 4:00 p.m. Note: Maintenance. Laurel Hill Boulevard Traffic Pattern: • Left lane closed W/B from Long Island Expressway to 54th Avenue (24 hour lane closure). Note: Realignment of Laurel Hill Boulevard. 6/26/2017 • Shoulder closure W/B ramp to W/B Brooklyn Queens Expressway from 9:00 a.m. to 3:00 p.m. Maurice Avenue 6/28/2017 • One lane closed Both Directions near Long Island Expressway from 8:00 a.m. to 3:00 p.m. 54th Avenue Traffic Pattern: • All lanes closed Both Directions from 43rd Street to Laurel Hill Boulevard (24 hour lane closure). Note: Demolition of Existing Girders and Reconstruction. 84th Street 6/27/2017 • One lane closed Both Directions under Belt Parkway from 8:00 a.m. to 3:00 p.m. 8 6/23/2017 D900011 (Bowers) D031431 (Stantec) D031431 (Stantec) D900011 (Bowers) D031431 (Stantec) 1 Staten Island Korean War Veterans Memorial Parkway 6/29/2017 • Left lane closed N/B at Tyrellan Avenue from 10:00 a.m. to 3:00 p.m. • Right shoulder closed N/B at Tyrellan Avenue from 10:00 a.m. to 3:00 p.m. • Right shoulder closed S/B at Notus Avenue from 10:00 a.m. to 3:00 p.m. Martin Luther King Expressway 6/26/2017 • Left shoulder closed N/B at Walker Street from 8:00 a.m. to 3:00 p.m. Staten Island Expressway 6/23/2017 – 6/24/2017 • One or two lanes closed W/B from Hylan Boulevard to Mosel Avenue from 10:00 p.m. to 5:00 a.m. Note: Remove and Install Armored Joints. 6/26/2017 – 6/30/2017 • One lane closed W/B from Hylan Boulevard to Mosel Avenue from 9:00 a.m. to 3:00 p.m. Note: Joint Remove and Installation. 6/28/2017 • Right shoulder closed W/B near South Avenue from 9:00 a.m. to 3:00 p.m. • Right lane closed W/B near South Avenue from 9:00 a.m. to 3:00 p.m. 6/29/2017 • Right shoulder closed W/B at Martin Luther King Expressway Interchange from 9:00 a.m. to 3:00 p.m. 6/29/2017 • One lane closed B/D from Hylan Boulevard to Mosel Avenue from 10:00 a.m. to 3:00 p.m. West Shore Expressway 6/26/2017 • Right shoulder closed N/B at Victory Boulevard from 10:00 a.m. to 3:00 p.m. • Right shoulder closed S/B at Edward Curry Avenue from 10:00 a.m. to 3:00 p.m. 6/28/2017 • Right shoulder closed S/B at Bloomingdale Road from 10:00 a.m. to 3:00 p.m. • Right shoulder closed N/B at Rossville Avenue from 10:00 a.m. to 3:00 p.m. Mosel Avenue 6/30/2017 • One lane closed B/D from Pierce Street to Sable Avenue from 10:00 a.m. to 3:00 p.m. 9 6/23/2017 D263106 (Ledlon) D263106 (Ledlon) D262962 (Lee) D263106 (Ledlon) D031433 (Weidlinger) D263106 (Ledlon) D031433 (Weidlinger) 1 NYCDOT Weekend Construction PRELIMINARY WEEKEND TRAFFIC ADVISORY Friday June 23, 2017 to Sunday June 25, 2017 As part of its citywide traffic improvement program, the New York City Department of Transportation has compiled a list of areas where Street construction or Street events will impede the normal flow of traffic this weekend. MANHATTAN West 3rd Street between Thompson Street and LaGuardia Place: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm to facilitate crane operation. West 15th Street between 9th Avenue and 10th Avenue: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm to facilitate crane operation. West 21st Street between 6th Avenue and 7th Avenue: This street will be closed 7am to 6pm Saturday and Sunday to facilitate crane operation. West 29th Street between 11th Avenue and 10th Avenue: This street will be closed 5am to 2pm Saturday and Sunday to facilitate crane operation. West 33rd Street between 10th Avenue and 9th Avenue: This street will be 6am to 9pm Saturday to facilitate crane operation. West 33rd Street between 5th Avenue and Broadway: This street will be closed 3am to 11:59am Saturday and Sunday to facilitate crane operation. East 43rd Street between 2nd Avenue and Tudor City Place: This street will be closed 5am to 2pm Saturday and Sunday to facilitate crane operation. East 43rd Street between 3rd Avenue and 2nd Avenue: This street will be closed 6am to 9pm Saturday and Sunday to facilitate crane operation. West 49th Street between 11th Avenue and 10th Avenue: This street will be closed 4am to 2pm Saturday and Sunday to facilitate crane operation. East 59th Street between 1st Avenue and Sutton Place: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm to facilitate crane operation. East 60th Street between 1st Avenue and Sutton Place: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm to facilitate crane operation. East 66th Street between 5th Avenue and Madison Avenue: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm to facilitate crane operation. East 78th Street between Lexington Avenue and 3rd Avenue: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm to facilitate crane operation. East 104th Street between Park Avenue and Lexington Avenue: This street will be closed Saturday 12:01am to Sunday 11:59pm to facilitate crane operation. East 104th Street between Northbound Park Avenue and Southbound Park Avenue: This street will be closed Saturday from 12:01am to Sunday 11:59pm to facilitate crane operation. Lexington Avenue between East 22nd Street and East 23rd Street: This street will be closed from 8am to 10pm Saturday and 9am to 10am Sunday to facilitate crane operation. Irving Place between East 15th Street and East 16th Street: This street will be closed Sunday from 12:01am to 8am to facilitate crane operation. 10 6/23/2017 1 NYCDOT Weekend Construction (continued) MANHATTAN (continued) Park Avenue between East 103rd Street and East 104th Street: This street will be closed Saturday from 12:01am to Sunday 11:59pm to facilitate crane operation. Perry Street between Bleeker Street and West 4th Street: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm to facilitate crane operation. Worth Street between Church Street and Broadway: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm to facilitate utility construction. Worth Street between Broadway and Lafayette Street: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm to facilitate utility construction. BROOKLYN/QUEENS Greenpoint Avenue Bridge over Newtown Creek: One of two eastbound (Queens-bound) lanes will be closed from 7am to 3pm Saturday and/or Sunday to facilitate NYCDOT Bridges repairs. BROOKLYN East 13th Street between Avenue J and Avenue I: This street will be closed Saturday from 8am to 6pm to facilitate crane operation. North Oxford Street between Park Avenue and Flushing Avenue: This street will be closed from 2pm to 10pm Saturday and Sunday to facilitate crane operation. MANHATTAN/QUEENS Ed Koch (Queensboro) Bridge 58th Street Entrance Ramp: One of two lanes on the 58th Street entrance ramp to the South Upper Roadway to Queens will be closed Saturdays and Sundays from 8am to 2:30pm through July 2017 to facilitate NYCDOT Bridge component rehabilitation work on the 58th Street entrance ramp deck. 11 6/23/2017 1 NYCDOT Weekly Construction WEEKLY TRAFFIC ADVISORY Saturday June 24, 2017 to Friday June 30, 2017 The City of New York’s Department of Transportation issued a traffic alert for this week providing the locations of road construction and events where lane and street closings will affect the flow of traffic. Lane closings may also occur due to circumstances beyond our control. Major road, lane and street closings for the coming week are as follows: EAST RIVER BRIDGE CROSSINGS Williamsburg Bridge: There are four lanes of traffic in each direction on the bridge. Trucks are allowed on the outer roadways only. A single lane in each direction may be closed off peak hours as needed to facilitate NYCDOT bridge inspection and maintenance work. Ed Koch/Queensboro Bridge: The North Inner Lower Roadway is Manhattan-bound with access from Queens Plaza North to Second Avenue and East 60th Street. The South Inner Lower roadway is Queens-bound with access from 2nd Avenue to Queens Plaza South. Trucks are allowed on the lower inner roadways only. Trucks are prohibited from the upper and outer roadways. The North Upper Roadway is Manhattan-bound at all times. Access is to East 62nd Street/East 63rd Street in Manhattan from Thomson Avenue, 21st Street at Queens Plaza North, and 11th Street at Queens Plaza South in Queens. The South Upper Roadway is Queens-bound except Monday to Friday from 6am to 10am when the roadway is reversed and accommodates the Manhattan bound high occupancy vehicle (HOV) lane containing two or more people. Access is to East 58th Street/East 57th Street in Manhattan from Thomson Avenue or 21st Street at 43rd Avenue in Queens. The South Outer Roadway of the lower level is open to passenger cars only with access from westbound 59th Street off of 1st Avenue to Queens Plaza South (except 9pm-6am nightly when roadway is closed to traffic). The North Outer Roadway will be fully closed daily from 9pm to 5am through June 2017 to facilitate utility construction. Free shuttle bus service and bicycle transport will be provided during these times. One lane in each direction on the lower and upper roadway will be closed from 12:01am to 5am Monday to Friday through June 2017 to facilitate NYCDOT Bridge maintenance. One lane will be closed on the 21st Street exit ramp upper deck from 11pm to 5:30am Sunday nights to Friday mornings through June 2017, to facilitate NYCDOT Bridges component rehabilitation work. Brooklyn Bridge: One of three lanes will be closed in each direction from 10pm to 6am and two of three lanes will be closed in each direction from 11pm to 6am weeknights through June 30, 2017. Additionally one of three lanes eastbound (Brooklyn-bound) will be closed from 10am to 3pm to Friday, June 30, 2017. These lane closures are necessary to facilitate NYCDOT Bridges roadway repairs and maintenance. Manhattan Bridge: There are five lanes westbound and two lanes eastbound. No trucks are permitted on the North Upper westbound roadway from 5am to 10am Monday to Friday. Two lanes on the westbound (Manhattan-bound) Lower Roadway will be closed weeknights from 12:01am to 5am until June 30, 2017 to facilitate NYCDOT bridge pavement repairs. MANHATTAN Trans-Manhattan Expressway (TME) Connector Ramp from George Washington Bridge to Harlem River Drive: One of two lanes in either direction (northbound or southbound) will be intermittently closed from 10pm to 5am Monday to Thursday, and from 12:01am to 10am Saturday through September 2017 to facilitate NYCDOT Bridges repairs. Battery Park Underpass between FDR Drive and Route 9A: One tube in either direction will be fully closed from 10pm to 5am Monday night to Friday morning, and 1am to 8am Saturday through July 2018 to facilitate NYCDOT Bridges electrical rehabilitation. Motorists should follow the posted detours. Park Avenue Tunnel (between East 33rd Street and East 40th Street): The tunnel will be fully closed to traffic from 9pm to 6am Monday nights to Friday mornings, and from 9pm Friday through 6am Monday through June 2017 to facilitate NYCDOT Bridges Park Avenue Tunnel rehabilitation work. FDR Drive (southbound) from 68th Street and 63rd Street: One of three lanes southbound will be closed from 11pm to 5:30am Monday to Friday, 12:01am to 6:30am Saturday and from 1am to 11am Sunday through mid September 2017 to facilitate long term building construction. FDR Drive at East 91st Street: One of three lanes in either direction (northbound or southbound) may be closed from 11pm to 5:30am Monday to Friday, 12:01am to 6:30am Saturday and 1am to 11am Sunday. Two of three lanes in either direction (northbound or southbound) may be closed from 1am to 5am Tuesday to Friday, 2am to 6am Saturday and 2am to 7am Sunday. These lane closures are necessary through July 2017 to facilitate NYCDDC Marine Transfer Station construction. 12 6/23/2017 1 NYCDOT Weekly Construction (continued) MANHATTAN (continued) Route 9A/West Street (northbound/southbound) between Battery Place and Vesey Street: One northbound lane will be closed from 10pm to 5am Monday to Friday, 8:30pm Friday to 8am Saturday and 8:30pm Saturday to 10:30am Sunday. Two northbound lanes will be closed from 1am to 5am Monday to Friday, 2am to 7am Saturday and 12:01am to 8am Sunday. One southbound lane will be closed from 11pm to 5am nightly. Two southbound lanes will be closed from 1am to 5am Monday to Friday, 3am to 8am Saturday and 3am to 9am Sunday. These lane closures are necessary to facilitate NYSDOT roadway rehabilitation work. Route 9A/West Street (northbound/southbound) between Vesey Street and Canal Street: One northbound lane will be closed from 10am to 3pm and 10pm to 5am Monday to Friday, 10pm Friday to 9am Saturday and 10pm Saturday to 9am Sunday. Two northbound lanes will be closed from 10pm to 5am Monday to Friday, 11pm Friday to 8am Saturday and 11pm Saturday to 8am Sunday. One southbound lane will be closed from 9pm to 5am Monday to Friday, 10pm Friday to 10am Saturday and 10pm Saturday to 10am Sunday. Two southbound lanes will be closed from 12:01am to 5am Monday to Friday, 1am to 9am Saturday and 2am to 10am Sunday. These lane closures are necessary to facilitate NYSDOT roadway rehabilitation work. Route 9A/West Street (northbound/southbound) between Canal Street and 14th Street: One northbound lane will be closed from 9pm to 6am Monday to Friday, 8pm Friday to 11:59am Saturday and 9pm Saturday to 1pm Sunday. Two northbound lanes will be closed from 11pm to 6am Monday to Friday, 1am to 8am Saturday and 1am to 10am Sunday. One southbound lane will be closed from 10pm to 6am Monday to Friday, 12:01am to 11:59am Saturday and Sunday. Two southbound lanes will be closed from 1am to 6am Monday to Friday, 2am to 7am Saturday and 3am to 8am Sunday. These lane closures are necessary to facilitate NYSDOT roadway rehabilitation work. Route 9A/West Street (northbound/southbound) between 14th Street and 24th Street: One northbound lane will be closed from 11pm to 6am Monday to Friday, 12:01am to 9am Saturday and 1am to 10am Sunday. Two northbound lanes will be closed from 12:01am to 6am Monday to Friday, 2am to 7am Saturday and 3am to 8am Sunday. One southbound lane will be closed from 9pm to 6am Monday to Friday, 12:01am to 9am Saturday and 12:01am to 10am Sunday. Two southbound lanes will be closed from 12:01am to 6am Monday to Friday, 1am to 6am Saturday and 2am to 8am Sunday. These lane closures are necessary to facilitate NYSDOT roadway rehabilitation work. Route 9A/West Street (northbound/southbound) between 42nd Street and 50th Street: One northbound lane will be closed from 9am to 2pm and 11pm to 7am Monday to Friday, 12:01am to 10am Saturday and 12:01am to 1pm Sunday. Two northbound lanes will be closed from 12:01am to 6am Monday to Friday, 2am to 8am Saturday and 2am to 10am Sunday. One southbound lane will be closed from 8pm to 6am Monday to Friday, 8pm Friday to 9am Saturday and 8pm Saturday to 11am Sunday. Two southbound lanes will be closed from 11pm to 6am Monday to Friday, 12:01am to 8am Saturday and 1am to 9am Sunday. These lane closures are necessary to facilitate NYSDOT roadway rehabilitation work. Route 9A/West Street (northbound/southbound) between 50th Street and 59th Street: One northbound lane will be closed from 11pm to 6am Monday to Friday, 12:01am to 10am Saturday and 1am to 11:59am Sunday. Two northbound lanes will be closed from 12:01am to 6am Monday to Friday, 2am to 9am Saturday and 3am to 10am Sunday. One southbound lane will be closed from 9pm to 6am Monday to Friday, 12:01am to 8am Saturday and 12:01am to 11am Sunday. Two southbound lanes will be closed from 12:01am to 6am Monday to Friday, 1am to 7am Saturday and 1am to 8am Sunday. These lane closures are necessary to facilitate NYSDOT roadway rehabilitation work. 10th Avenue between West 30th Street and West 33rd Street: Three lanes of traffic will be maintained on 10th Avenue through 2017 to facilitate NYCDDC roadway reconstruction work and ongoing building construction. 11th Avenue at West 30th Street: Three lanes of traffic will be maintained on 11 th Avenue, and one lane of traffic on West 30th Street through September 2017 to facilitate NYCDDC water main work and new building construction activity. West 30th Street between 11th Avenue and 10th Avenue: One lane of traffic is mainyained on West 30 th Street to facilitate new building construction and/or NYCDDC water main installation project through September 2017. West 33rd Street between 10th Avenue and 11th Avenue: This street is fully closed closed to facilitate long term roadway reconstruction work. Harlem River Drive Northbound Exit Ramp #19 to East 125 th Street: This exit ramp is closed through 2017 for the reconstruction of the Harlem River Viaduct. Motorists should use the East 135 th Street/Exit 21 as an alternate exit. 13 6/23/2017 1 NYCDOT Weekly Construction (continued) MANHATTAN/BROOKLYN Hugh L. Carey Tunnel: One tube will be closed nightly Monday to Friday between 8:30pm and 5:30am and Saturday from 11pm to 8am to facilitate tunnel repairs through 2018. Weekend-long single tube closures will begin Friday night from 9:30pm and continue through 5:30am Monday morning. In addition one tube will be closed for routine maintenance work Sunday night beginning at 11pm through 5:30am Monday. During these times there will be one lane in each direction in the remaining tube. Hugh L Carey Brooklyn Plaza/Gowanus Expressway Ramps: The inbound ramp from the Gowanus Expressway to the Hugh L. Carey Tunnel will have one out of two lanes (Plus one HOV lane) open Monday to Friday 6 am to 10:30 am and at all other times one out of two lanes will be open. The outbound ramp from the Hugh L. Carey Tunnel to the Gowanus Expressway will have one out of two lanes open Monday to Friday 6 am to 10:30 am and at all other times two out of two lanes will be open. Outbound traffic seeking entrance to the eastbound Brooklyn Queens Expressway will follow a loop detour on Hamilton Avenue and Clinton Street. This is to facilitate paving work by MTA-Bridges and Tunnels through July 1, 2017. BROOKLYN Gowanus Expressway/Belt Parkway Interchange between 86 th Street and 45th Street: One of three lanes in each direction may be closed Monday to Friday from 10am to 3pm to facilitate NYSDOT long term roadway rehabilitation work. Hamilton Avenue between Clinton Street and Prospect Expressway; Third Avenue between 53rd Street and 6th Avenue; 65th Street between Third Avenue and Sixth Avenue: One lane may be closed on the above roadways northbound towards the Brooklyn Battery tunnel from 10am to 3pm weekdays. One lane may be closed on the above roadways southbound towards the Verrazano Narrows Bridge from 7am to 3pm weekdays to facilitate NYSDOT long term work. Hamilton Avenue Ramp to Westbound Gowanus Expressway at Hugh Cary Tunnel Place: The Hamilton Avenue entrance ramp to Westbound Gowanus Expressway will be closed round-the-clock through July 2017 to facilitate repaving work by MTA-Bridges and Tunnels. Traffic will follow a signed detour to 65th Street to access the highway. This ramp is already routinely closed for PM peak hours. Belt Parkway/Shore Parkway at 69th Street: One lane in each direction from 10am to 2pm weekdays to facilitate NYCDOT Bridge reconstruction work. Prospect Expressway (inbound) Northbound at Gowanus Expressway Interchange: A special contra-flow lane is open for buses from 6am to 10am Monday to Friday. The priority lane will use the outbound Prospect Expressway connector ramp for inbound buses. The Prospect priority lane will run parallel to the Gowanus Expressway special lane from the Prospect/Gowanus interchange to the Hugh L. Carey Tunnel. Brooklyn-Queens Expressway from Atlantic Avenue to Cadman Plaza: Two of three lanes will be closed eastbound (Queens-bound) from 1am to 5am (for a maximum of three Wednesday nights) until June 28, 2017, to facilitate NYCDOT Bridges maintenance and repairs. Atlantic Avenue between Fort Greene Place and Carlton Avenue: Three lanes of traffic are maintained westbound and two lanes maintained eastbound as part of the Atlantic Yards long term construction project. Belt Parkway Bridge over Mill Basin: One of three lanes may be closed in either direction to facilitate long term NYCDOT Bridge reconstruction from 10am to 2pm Monday to Friday through December 2017. MANHATTAN/QUEENS Queens Midtown Tunnel: One tube in either direction will be closed from 11pm Friday nights to 5:30am Monday mornings. The Manhattan-bound (north) tube is closed Monday through Thursday nights, from 9:30pm to 5:30am. This is to accommodate ongoing Superstorm Sandy restoration work. One lane in each direction will always remain open in the other tube when one tube is closed. QUEENS Van Wyck Expressway under Roosevelt Avenue: One of three lanes will be closed in either direction from 11 pm to 5 am Monday to Friday, and from 12:01 am to 6 am Saturday, and two of three lanes will be closed from 12:01 am to 5 am Monday to Friday, and from 1 am to 6 am Saturday through June 24, 2017 to facilitate NYCDOT Bridges protective shielding repairs under the Roosevelt Avenue Bridge. Intermittent full closures may occur for a maximum of five minutes between the hours of 11 pm and 6 am. 14 6/23/2017 1 NYCDOT Weekly Construction (continued) QUEENS (continued) Belt Parkway between Cross Bay Boulevard and 149 th Street: One of three lanes in either direction may be closed 10am to 2pm weekdays and 10pm to 5am weeknights. Two of three lanes in either direction may be closed 1am to 5am weeknights to facilitate NYCDEP sewer reconstruction through September 2017. Additionally one of two lanes on the Nassau Expressway exit ramp to eastbound Belt Parkway from 115th Street to 128th Street will be closed. Cross Island Parkway under Northern Boulevard: One of three lanes in either direction will be closed from 10pm to 1am Monday nights to Saturday mornings an 10pm Saturday nights to 2am Sunday mornings, and two of three lanes in either direction will be closed from 1am to 5am Mondays to Friday mornings, 1am to 6am Saturday mornings and 2am to 9am Sunday mornings, to facilitate NYC DOT Bridges protective bridge coating. One lane for traffic in either direction will remain open to traffic at all times. 60th Lane between Eliot Avenue and Metropolitan Avenue: 60th Lane will change direction from one-way northbound to one-way southbound through January 2018 to facilitate NYCDOT Bridges deck replacement at the Metropolitan Avenue and Fresh Pond Road Bridge over the Long Island Railroad. BRONX Unionport Bridge over Westchester Creek: One lane at a time may be closed in both directions from 11pm to 5am Sunday nights to Friday mornings, 11pm Friday nights to 7am Saturday mornings and 9pm Saturday nights to 7am Sunday mornings, through August 11, 2017 to facilitate NYCDOT Bridges repairs. Major Deegan Expressway (1-87) Northbound Entrance Ramp #9 from West Fordham Road: This ramp will be fully closed to traffic from 10pm to 10am seven days per week through December 2017 to facilitate NYCDEP repairs to wastewater line. Motorists should follow the posted detour. Leggett Avenue Bridge over Amtrak/CSX Railroad: The eastbound side of the bridge will be fully closed to traffic with two-way traffic maintained on the westbound side of the bridge from 10pm to 6am nightly, through August 2017, to facilitate NYCDOT Bridges rehabilitation. STATEN ISLAND Martin Luther King Expressway northbound exit/entrance ramps to/from Trantor Place: Effective November 4, 2013 the northbound exit ramp (last exit before Bayonne Bridge) is closed. The Trantor Place entrance to northbound Expressway/Bayonne Bridge is also closed. Motorists should follow posted detours and use the prior Forest Avenue exit, and the Forest Avenue entrance. This long term closure expected through November 2017 is part of the PANY/NJ work associated with the Bayonne Bridge navigational clearance closure project. STATEN ISLAND/NEW JERSEY CROSSINGS Bayonne Bridge: One of two lanes in each direction is open to traffic for PANY/NJ long term navigational clearance project. No oversized or overweight vehicles are permitted. Overnight Bridge closures started January 8th, 2014 and continue through the duration of the project. The closures are: Monday through Thursday from 9pm to 5am and Friday midnight to 11:59pm Saturday. No weekend closures on Sunday and holiday weekends. Weekday full closures are from 9am to 3pm Monday to Friday. During closures, motorists should use the Goethals Bridge as an alternate. 15 6/23/2017 1 MTA HUGH L. CAREY TUNNEL (MTA) MTA Bridges & Tunnels: One tube will be closed nightly Monday to Friday between 9:30pm and 5:30am to facilitate tunnel repairs through 2018. Weekend-long single tube closures will begin Friday night from 9:30pm and continue through 5:30am Monday morning. In addition one tube will be closed for routine maintenance work Sunday night beginning at 11pm through 5:30 Monday. During these times there will be one lane in each direction in the remaining tube. Motorists may experience delays. This work is weather dependent and may be canceled in the event of inclement weather. MTA Bridges & Tunnels: construction on Brooklyn Battery Tunnel both directions Brooklyn Side (Brooklyn) at the Plaza the work zone will be shifted from the center lanes to the east side of the plaza. As a result there will be a full closure of the Hicks St entrances from Hamilton Ave Manhattan-bound. However, the Clinton St entrance ramp & the Hamilton Ave (SB) entrance to the BQE East & Gowanus will be reopened, 2 lanes open in both directions on the plaza, morning two-way tube for the HOV/Bus traffic from Gowanus/BQE operates, and 2 lanes open to the Gowanus from the tunnel. This is the final stage of the work that will restore the roadway surface on the plaza, starts Thursday June 15th, 2017 thru Saturday July 8th, 2017. MTA Bridges & Tunnels: weekend long construction on Brooklyn Battery Tunnel both directions Manhattan/Brooklyn Bound (Manhattan/Brooklyn), Continuous Friday June 23rd, 2017 8:00 PM thru Monday June 26th, 2017 5:30 AM 1 lane open to traffic. MARINE PARKWAY BRIDGE (MTA) MTA Bridges & Tunnels: scheduled roadwork on Marine Parkway Bridge northbound Brooklyn Bound (New York), Tuesday May 2nd, 2017 thru Sunday July 2nd, 2017, Monday thru Friday, 07:00 AM thru 05:00 PM, 1 lane closed. QUEENS MIDTOWN TUNNEL (MTA) MTA Bridges & Tunnels: construction on Queens Midtown Tunnel both directions between Manhattan Side (Manhattan) and Queens Side (New York) one tube closed & two way traffic in the other tube, drive with caution. A truck ban will be in place during these closures., Thursday June 9th, 2016 thru Thursday September 7th, 2017 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 PM thru 05:30 AM, north tunnel closed, Thursday June 9th, 2016 thru Sunday September 3rd, 2017 Friday/ Saturday, 12:00 AM thru 08:00 AM, north tunnel closed. MTA Bridges & Tunnels: construction on Queens Midtown Tunnel both directions Manhattan/Queens Bound (Manhattan/Queens) one tube open with two-way traffic in the other tube. TRUCKS ARE BANNED DURING THIS CLOSURE, Monday May 29th, 2017 thru Thursday June 29th, 2017 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, 1 lane open, Monday July 3rd, 2017 thru Tuesday July 4th, 2017, 09:00 PM thru 06:00 AM, 1 lane open, Wednesday July 5th, 2017 thru Friday July 28th, 2017 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, 1 lane open. MTA Bridges & Tunnels: construction on Queens Midtown Tunnel both directions Manhattan/Queens Bound (Manhattan/Queens) one tube open with two-way traffic for ongoing Sandy Restoration. TRUCKS ARE BANNED DURING THIS CLOSURE, Continuous Friday June 2nd, 2017 10:00 PM thru Monday June 5th, 2017 6:00 AM 1 lane open, Continuous Friday June 16th, 2017 10:00 PM thru Monday June 19th, 2017 6:00 AM 1 lane open, Continuous Friday June 23rd, 2017 10:00 PM thru Sunday June 25th, 2017 6:00 AM 1 lane open. MTA Bridges & Tunnels: construction on Queens Midtown Tunnel both directions Manhattan/Queens Bound (Manhattan/Queens) one tube open with two-way traffic for ongoing Sandy Restoration. TRUCKS ARE BANNED DURING THIS CLOSURE, Continuous Friday June 23rd, 2017 10:00 PM thru Sunday June 25th, 2017 6:00 AM 1 lane open. ROBERT F. KENNEDY BRIDGE (MTA) MTA Bridges & Tunnels: longterm construction on RFK Triborough Bridge northbound ramp to Manhattan Span (Manhattan), Continuous Monday August 15th, 2016 4:15 PM thru Wednesday January 31st, 2018 5:00 AM 1 lane of 3 lanes closed. 16 6/23/2017 1 MTA (continued) VERRAZANO BRIDGE (MTA) MTA Bridges & Tunnels: longterm construction on Verrazano-Narrows Bridge both directions Brooklyn/Staten Island Bound (New York) During rush hour, 3 lanes will be open in the peak direction by using a moveable barrier., Continuous Saturday March 7 th, 2015 11:00 PM thru Saturday July 1st, 2017 11:59 PM 1 lane closed. MTA Bridges & Tunnels: bridge work on Verrazano-Narrows Bridge westbound Staten Island Side (Staten Island) traffic pattern shift starting this weekend at the toll plaza. Several toll lanes will be closed to accommodate the next stage of work for installation of Cashless Tolling structures and associated systems. Cashless Toll Collection is set to start this summer. 17 6/23/2017 1 Port Authority NY/NJ BAYONNE BRIDGE (PA) Port Authority NY/NJ: bridge construction on Bayonne Bridge both directions between New Jersey Side (Bayonne) and New York Side (Staten Island), Friday June 23rd, 2017 thru Monday June 26th, 2017 Sunday/ Friday/ Saturday, 09:00 PM thru 05:00 AM, all lanes closed and detoured. GEORGE WASHINGTON BRIDGE (PA) Port Authority NY/NJ: construction on George Washington Bridge eastbound Mid-Span/Lower Level (Manhattan) to New York Side/Lower Level (Manhattan), Monday June 19th, 2017 thru Friday June 23rd, 2017, Monday thru Friday, 11:30 AM thru 03:30 PM, right lane closed. Port Authority NY/NJ: construction on George Washington Bridge westbound New York Side/Lower Level (Manhattan) to MidSpan/Lower Level (Manhattan), Monday June 19th, 2017 thru Friday June 23rd, 2017, Monday thru Friday, 08:30 AM thru 02:30 PM, right lane closed. Port Authority NY/NJ: construction on George Washington Bridge eastbound ramp from Palisades Interstate Parkway Toll Plaza (Fort Lee), Tuesday June 20th, 2017 thru Friday June 23rd, 2017 Tuesday/ Wednesday/ Thursday/ Friday, 10:30 AM thru 03:30 PM, 1 lane closed. Port Authority NY/NJ: construction on George Washington Bridge ramp to (Fort Lee) Northbound Palisades Interstate Parkway, Monday June 19th, 2017 thru Friday June 23rd, 2017 Monday/ Thursday/ Friday, 08:30 AM thru 02:30 PM, left shoulder closed. Port Authority NY/NJ: sign work on George Washington Bridge westbound New York Side/Upper Level (Manhattan) to New Jersey Side/Upper Level (Fort Lee), Friday June 23rd, 2017 thru Saturday June 24th, 2017, 10:00 PM thru 10:00 AM, 2 left lanes closed for repairs. Port Authority NY/NJ: sign work on George Washington Bridge eastbound New Jersey Side/Upper Level (Fort Lee) to New York Side/Upper Level (Manhattan), Friday June 23rd, 2017 thru Saturday June 24th, 2017, 10:00 PM thru 10:00 AM, left lane closed for repairs. Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New York Side/Lower Level (Manhattan) to Harlem River Drive (Manhattan) Lower Trans Manhattan Expressway, Saturday June 24th, 2017 thru Sunday June 25th, 2017, 11:59 PM thru 08:00 AM, all lanes closed and detoured. Port Authority NY/NJ: construction cancelled on George Washington Bridge eastbound New Jersey Side/Lower Level (Fort Lee) to New York Side/Lower Level (Manhattan), Saturday June 24th, 2017 thru Sunday June 25th, 2017, 09:00 PM thru 11:00 AM, all lanes closed. Port Authority NY/NJ: sign work on George Washington Bridge eastbound New Jersey Side/Upper Level (Fort Lee) to New York Side/Upper Level (Manhattan), Sunday June 25th, 2017, 12:01 AM thru 08:00 AM, left lane closed for repairs Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New Jersey Side/Upper Level (Fort Lee) to New York Side/Upper Level (Manhattan) Intermittent Traffic Holds, Sunday June 25th, 2017, 02:00 AM thru 05:00 AM, all lanes blocked. Port Authority NY/NJ: construction on George Washington Bridge (Fort Lee) Southbound Palisades Interstate Parkway Toll Plaza to New Jersey Side / Upper Level, Saturday June 24th, 2017 thru Sunday June 25th, 2017, 09:00 PM thru 09:00 AM, all lanes closed. Port Authority NY/NJ: construction cancelled on George Washington Bridge eastbound ramp from Palisades Interstate Parkway Toll Plaza (Fort Lee), Saturday June 24th, 2017 thru Sunday June 25th, 2017, 09:00 PM thru 11:00 AM, left lane closed. Port Authority NY/NJ: bridge construction on George Washington Bridge westbound New York Side/Upper Level (Manhattan) to New Jersey Side/Upper Level (Fort Lee), Sunday June 25th, 2017, 12:01 AM thru 08:00 AM, 2 left lanes closed for repairs. Port Authority NY/NJ: bridge construction on George Washington Bridge westbound New York Side/Upper Level (Manhattan) to New Jersey Side/Upper Level (Fort Lee) Intermittent Traffic Holds, Sunday June 25th, 2017, 02:00 AM thru 05:00 AM, all lanes blocked. Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New York Side/Lower Level (Manhattan) to Harlem River Drive (Manhattan) lower Trans Manhattan Expressway, Saturday June 24th, 2017, 12:01 AM thru 08:00 AM, all lanes closed and detoured. 18 6/23/2017 1 Port Authority NY/NJ (continued) GEORGE WASHINGTON BRIDGE (PA) (continued) Port Authority NY/NJ: construction cancelled on George Washington Bridge westbound Harlem River Drive (Manhattan) to Henry Hudson Parkway (Manhattan) Lower Level Trans-Manhattan Expressway., Saturday June 24th, 2017, 12:01 AM thru 08:00 AM, 2 right lanes closed. Port Authority NY/NJ: bridge construction on George Washington Bridge westbound Harlem River Drive (Manhattan) to Henry Hudson Parkway (Manhattan) lower Trans Manhattan Expressway, Saturday June 24th, 2017, 12:01 AM thru 08:00 AM, 2 right lanes closed for repairs. Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New York Side/Lower Level (Manhattan) to Harlem River Drive (Manhattan) lower Trans Manhattan Expressway, Sunday June 25th, 2017, 12:01 AM thru 08:00 AM, all lanes closed and detoured. HOLLAND TUNNEL (PA) Port Authority NY/NJ: safety improvements on Holland Tunnel eastbound between New Jersey Side - South Tube (Jersey City) and New York Side - South Tube (Manhattan) , Sunday October 2nd, 2016 thru Monday October 2nd, 2017, 06:00 AM thru 08:00 AM, 1 lane closed. Port Authority NY/NJ: tunnel repairs on Holland Tunnel eastbound New Jersey Side - South Tube (Jersey City) to New York Side - South Tube (Manhattan), Sunday June 25th, 2017 thru Friday June 30th, 2017 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, 1 lane closed. Port Authority NY/NJ: tunnel repairs on Holland Tunnel westbound New York Side - North Tube (Manhattan) to New Jersey Side - North Tube (Jersey City), Monday June 26th, 2017 thru Friday June 30th, 2017, Monday thru Friday, 12:00 AM thru 05:30 AM, 1 lane closed. JOHN F. KENNEDY INTERNATIONAL AIRPORT (PA) Port Authority NY/NJ: construction on John F. Kennedy International Airport both directions (Queens) Van Wyck Expressway at Federal Circle, Monday June 26th, 2017 thru Tuesday June 27th, 2017, 11:00 PM thru 05:00 AM, all lanes closed and detoured. LAGUARDIA AIRPORT (PA) Port Authority NY/NJ: reconstruction on La Guardia Airport Long Term Parking P3 (New York) is closed permanently. Use lots P 2, P 4 and P 5. Free shuttle service is available to terminals and parking lots. Allow extra time., Continuous Tuesday June 7th, 2016 12:00 AM thru Wednesday June 7th, 2017 11:59 PM. Port Authority NY/NJ: construction on La Guardia Airport Queens - New York (New York) The 102ND Street Bridge closed to inbound traffic. All Ped access and exiting traffic to 102ND Street is maintained. Detour is Ditmars WB to 94th Street LGA entrance., Continuous Tuesday June 28th, 2016 2:00 PM thru Sunday July 2nd, 2017 11:59 PM all lanes closed and detoured. LINCOLN TUNNEL (PA) Port Authority NY/NJ: tunnel repairs on Lincoln Tunnel both directions New Jersey Side - Center Tube (Weehawken Twp) to New York Side - Center Tube (Manhattan) , Saturday June 24th, 2017, 12:01 AM thru 08:00 AM, all lanes closed, Tuesday June 27th, 2017 thru Wednesday June 28th, 2017, 11:00 PM thru 05:00 AM, all lanes closed. Port Authority NY/NJ: tunnel repairs on Lincoln Tunnel westbound New York Side - North Tube (Manhattan) to New Jersey Side - North Tube (Weehawken Twp.), Sunday June 25th, 2017 thru Tuesday June 27th, 2017 Sunday/ Monday, 11:00 PM thru 05:00 AM, all lanes closed. Port Authority NY/NJ: tunnel repairs on Lincoln Tunnel eastbound New Jersey Side - South Tube (Weehawken Twp) to New York Side South Tube (Manhattan), Wednesday June 28th, 2017 thru Friday June 30th, 2017 Wednesday/ Thursday, 11:00 PM thru 05:00 AM, all lanes closed. 19 6/23/2017 1 Port Authority NY/NJ (continued) LINCOLN TUNNEL (PA) (continued) Port Authority NY/NJ: construction on New York Expressway/Dyer Avenue northbound 33rd Street (New York) to 39th Street (New York), Sunday June 25th, 2017 thru Friday June 30th, 2017 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, right lane closed for repairs. Port Authority NY/NJ: construction on New York Expressway/Dyer Avenue southbound 38th Street to 35th Street, Wednesday June 28th, 2017 thru Thursday June 29th, 2017, 11:00 PM thru 04:00 AM, 1 lane blocked. OUTERBRIDGE CROSSING (PA) Port Authority NY/NJ: EZ-Pass toll lane repairs on Outerbridge Crossing eastbound New York Side - Toll Plaza (Staten Island), Continuous Monday June 19th, 2017 12:01 AM thru Saturday June 24th, 2017 11:59 PM 1 toll lanes closed. Port Authority NY/NJ: bridge painting on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Friday June 23rd, 2017 thru Saturday June 24th, 2017, 11:59 PM thru 08:00 AM, right lane closed. 20 6/23/2017 1

Technical Artifacts (6)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainfacebook.com
Domainwww.511ny.org
Flight #AM1
Phone(718)482-4526
URLhttp://facebbook.com/NYSDOT
Wire RefTransfer Station

Related Documents (6)

DOJ Data Set 9OtherUnknown

From: FBI News Briefing cza

From: FBI News Briefing cza To: "FBINewsBriefing" Subject: [EXTERNAL EMAIL) - FBI Daily News Briefing - January 31, 2025 Date: Fri, 31 Jan 2025 11:30:12 +0000 Importance: Normal ce. View in Browser Federal Bureau of Investigation Seal January 31, 2025 Federal Bureau of Investigation Daily News Briefing (In coordination with the Office of Public Affairs) Email Public Affairs to subscribe to the Daily News Briefing. Mobile version and archive available here. Table of Contents IN THE NEWS • FBI Director Nominee Kash Patel Testifies at Confirmation Hearing • FBI Collaborates With DHS and DOJ in Federal Immigration Enforcement Efforts • Trump Administration Shakes Up Senior FBI Ranks • Internal Emails Offer Glimpse Into Early Days of Trump Election Inquiry • Tulsi Gabbard, and RFK Jr. Nomination Hearings • Collision Between Helicopter and Plane Kills 67 in Nation's Deadliest Air Disaster Since 2001 COUNTERTERRORISM • Congressional Delegation to Review Super Bowl Secur

20p
DOJ Data Set 9OtherUnknown

December 1, 2021 Alessi prep

December 1, 2021 Alessi prep AUSA SA Showed JA GX-52 and asked if he recognized it. • JA immediately said he believes GX-52 is one of the directories he remembers from JE's PB home. GX-52 is a bit smaller than he remembered the directories being, but the names in GX-52 are familiar. The type face is all the same, but JA remembers the letters being a bit larger and the book being a bit thicker. The format looks the same to JA. JA also recognizes that this book, like the one he remembers, has different names in the same page, some with a lot of numbers and some only one or two numbers. The book JA remembers also had the same binding and same cover as GX-52. • JA believes that this must be a newer version of the book he remembers that post-dates his employment because his name and his wife's name is no longer in it. • JA specifically remembered seeing many entries in GX-52 the book he saw when he worked for JE, such as the following: Alan Paul, Duchess and Duke of York, M

4p
Dept. of JusticeAug 22, 2017

15 July 7 2016 - July 17 2016 working progress_Redacted.pdf

Kristen M. Simkins From: Sent: To: Cc: Subject: Irons, Janet < Tuesday, July 12, 2016 10:47 AM Richard C. Smith     Hello Warden Smith,     mother is anxious to hear the results of your inquiry into her daughter's health.   I'd be grateful if you could  email or call me at your earliest convenience.  I'm free today after 2 p.m.  Alternatively, we could meet after the Prison  Board of Inspectors Meeting this coming Thursday.    Best wishes,    Janet Irons    1 Kristen M. Simkins From: Sent:

1196p
DOJ Data Set 10CorrespondenceUnknown

EFTA Document EFTA02090507

0p
Dept. of JusticeOtherUnknown

EFTA Document EFTA01313699

Invoice Number: 449648050 Invoice Date: Sep 23.2002 Account Number: 1144.2081.6 Page: 1 ol 10 JEFFREY E EPSTEIN 457 MADISON AVE NEW YORK NY 10022.6843 FedEx Tax 10 71.0427007 Billing Account Shipping Address: JEFFREY E EPSTEIN 457 MADISON AVE NEW YORK NY 10022-6843 US Invoice Summery Sep 23, 2002 Invoice Questions? FedEx Account Services Phone: (800) 622-1147 M-F 7-6 (CST) Fax: (800) 548.3020 Internet: mwtledex.com FedEx Express Services Transportation Charges 202.80

10p
DOJ Data Set 10OtherUnknown

EFTA01317670

6p

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.