Skip to main content
Skip to content
Case File
efta-01731901DOJ Data Set 10Other

EFTA01731901

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01731901
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Jeffrey Epstein <jeevacation@gmail.com> Sent: Thursday, September 10, 2015 11:41 PM To: Ann Rodriquez Subject: Re: Photos - September 10, 2015 ok for gym roof. / On Fri, Sep 11, 2015 at 1:07 AM, Ann Rodriquez wrote: They need to do exactly what was done =o the Gym. (Replace the bad wood under the Galvanize and change a portion =f the existing galvanize) The Banana tree heads w=re blown over and damaged which then damaged the smaller ones, Chris said =e had no choice but to cut them all back to the stump. He said they will g=ow back healthier and fuller. Jules said he=still have about 2-3 more days until Pebble Beach is completed. Ann R. On Sep 10, 2015, at 6:51 PM, jeffrey E. <jeevacation@gmail.com</=» wrote: =hat shlud we do to lirbarry roof?? . the banansa w=re taken away not cleaned by the master?? yes break the =Ian on pebble and no rock in cement ok. . yes jules canmake better. =br> On Thu,=Sep 10, 2015 at 11:24 PM, Daphne Wallace <d rote: Greetings=Sir, September 10 photos for your review and comments:<=div> Banana field - the bananas on the hillside below t=e Master have been cut and the area clean up is in progress =/div> Library Roof assessment - major damage has been discovered to th= wood underneath the galvanize on the Library side MBR flooring progress - today was sanding #2 - 9/11 is sanding #3 and epo=y 9/14 is polyurethane #1 - 9/15 is light sand of polyurethane #1 and po=yurethane #2 - 9/16 is light sand of polyurethane #2 and final polyurethan= - 9/17 is cleanup - 9/18 is curing - 9/19 is ready to move in <=r> Pebble Beach - Jules is almost complete with the cleanup - he=wants to add more rocks to shore up the waterside barrier against the wave= - Danny marked two lines for your review of how far you would like the sl=b to extend - the first marking is where the original slab ended and the s=cond marking is another 15 feet. Danny would EFTA_R1_00005132 EFTA01731901 like to know if you wis= to put back the same rough texture as what is presently there - if so, th= concrete will need to be mixed in the concrete mixers - the stones are to= large to move through the pump truck hose - Danny and Tom came up with th= mix that is presently there - Danny and Chris are also concerned about th= erosion beneath the remaining slab and are recommending the slab be remov=d and re-poured - Jules would prefer to jack hammer this final slab away r=ther than use the trackhoe because he is concerned about the steps crackin= if the slab is not removed carefully Seaweed - h=s returned - Anna will try to schedule getting it off the shoreline again =efore your return Stonewall along road to Info Ce=ter - in progress Waterfall cistern - in progress=- 9/11 will pour concrete - 9/14 will be block work Info Center entrance drive - the gravel was scraped away, the landscapin= mesh was added, and new gravel laid down Big Sal= Pond - re-hydration completed Grotto - blinds an= floors repainted, the blind louvers that are broken will be repaired and =ouched up, the weeds will be removed, weed kill applied and fresh gravel I=id down Hillside above Flagpole Pool - cleanup pr=gress Respectfully submitted, Daphne <=div> =C24> please note The informat=on contained in this communication is confidential, may be attorney-cli=nt privileged, may constitute inside information, and is intended only =or the use of the addressee. It is the property of JEE Unauthoriz=d use, disclosure or copying of this communication or any part thereof =s strictly prohibited and may be unlawful. If you have received this return e-mail o= by e-mail to j=evacation@gmail.com <mailto:jeevacation@gmail.com> , and destroy this communication and all copies =hereof, including all attachments. copyright -all rights reserved </=iv> =C24k please note 2 EFTA_R1_00005133 EFTA01731902 The information contained in this co=munication is confidential, may be attorney-client privileged, may c=nstitute inside information, and is intended only for the use of the ad=ressee. It is the property of JEE Unauthorized use, disclosure or co=ying of this communication or any part thereof is strictly prohibitedand may be unlawful. If you have received this communication in error,=please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.comc/=>, and destroy this communication and all copies thereof, including =11 attachments. copyright -all rights reserved --001a114f86f2a54bc1051f6d2 llf-- date-last-viewed 0.0 date-received 1441928459 flags 8590195713 remote•id 167073 3 EFTA_R1_00005134 EFTA01731903

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Emailevacation@gmail.com
Emailjeevacation@gmail.com
Emailjeevacation@gmail.comc

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.