Skip to main content
Skip to content
Case File
efta-02021676DOJ Data Set 10Other

EFTA02021676

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-02021676
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Greetings Mr. Epstein, September 30 project list photographs, and 3 new items, for your review and comments. The items highlighted were not photographed today: I. Courtyard 2. Grading main engineering road 3. Finish Main pool shelter 4. Tennis court and other main lights 5. Cabana 4 6. Gym - cabinet company visited site - will forward drawing and proposal 7. Cabana 4 furnishing - bed/headboard/armoire on site - Sarah researching round bedside tables4 bath .fixtures. on site 8. Flagpole bath and cabana - need JE clothes and shoes - bath fixtures on site - closet accessories on order 9. Main pool bath - furnish - fixtures on site 10. Palm trees - deliver to island 10/1 II. Sod - delivery postponed by sod farm 12. Tiling - in progress 13. Main planter 14. Brice cottage 15. Dock hou.4 16. Electrify info center 17. Five Palms IS. Grotto 19. Blue beach landscaping - plant palms week of 10/1 20. Heli wall 21. Curb for all roads 22. Night lights to motor court - on order 23 Steps to library 24. Library path 25. Benches 26. Driveway entry 27. Pool ladders 28. Flagpole lights are too hot 29. Flagpole grading 30. Flagpole wall banks 31. Stereo - Larry ordering speakers, Brice ordering speaker wire 32. Computer - Lion installed 33. Molyneux desk - not on site - in process of being crated - no shipping date as yet 34. Jet skis - shipping 9/28 35. Midnight Express - Larry has until 10/10 to try to sell - if not, will arrange shipping to island 36. Library landscaping 37. Pool palms - deliver to island 10/I (please see #10) 38. Color in basket 39. Waterfall EFTA_R1_00527542 EFTA02021676 40. Ba 42. High Flagpole road - bulldozer is on the main house grading, Peter is working on the main planter preparation, the road clearing is in progress 43. Math pool shelter (please see #3) 44. St. John terrace 45. Hangarc%painting in prggcos 46. Motor court 47. Archer platform 48. Bed 49. Plants bought from Italian woman - presently located on the beach and at the nursery Respectfully submitted, Daphne EFTA_R1_00527543 EFTA02021677

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.