Skip to main content
Skip to content
Case File
efta-02031218DOJ Data Set 10Other

EFTA02031218

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-02031218
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: jeevacation@g mail.com[jeevacation@gmail.com]; jeevacation mail.com 'eevacation@gmail.com] From: Sent: Subject: Gil issue Wed 12/8/2010 3:27:21 AM Jeffrey, I am having APU problems, the APU is over-speeding and shuts down, I am trouble shooting with Dallas Airmotive (APU overhaul experts) and Meridean Maintenance in Teterboro, should have more info tomorrow afternoon. early synopsis: Fuel control, or Torque converter fly-weights which controls fuel scheduling to apu and RPM,. the APU was running at 102% today which is high and has a safety switch set around 103% that shuts down APU for protection,. normal operation RPM is 100%. Cold weather is not ruled out either,. During our maintenance visit, we did not touch the APU., Dave is heading home in the morning, - I will remain until we have a remedy for APU - we are NOT in danger of being stuck, Albuquerque has 3 air start carts, a worse case scenario. I will keep you posted to my findings,. thanks, Larry EFTA_R1_00541257 EFTA02031218

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Emaileevacation@gmail.com
Emailjeevacation@gmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.