Case File
efta-02031218DOJ Data Set 10OtherEFTA02031218
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-02031218
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
To:
jeevacation@g mail.com[jeevacation@gmail.com];
jeevacation
mail.com 'eevacation@gmail.com]
From:
Sent:
Subject: Gil issue
Wed 12/8/2010 3:27:21 AM
Jeffrey,
I am having APU problems, the APU is over-speeding and shuts down, I am trouble shooting with Dallas
Airmotive (APU overhaul experts) and Meridean Maintenance in Teterboro, should have more info tomorrow
afternoon.
early synopsis: Fuel control, or Torque converter fly-weights which controls fuel scheduling to apu and RPM,. the
APU was running at 102% today which is high and has a safety switch set around 103% that shuts down APU
for protection,. normal operation RPM is 100%. Cold weather is not ruled out either,.
During our maintenance visit, we did not touch the APU.,
Dave is heading home in the morning,
- I will remain until we have a remedy for APU
- we are NOT in danger of being stuck, Albuquerque has 3 air start carts, a worse case scenario.
I will keep you posted to my findings,.
thanks,
Larry
EFTA_R1_00541257
EFTA02031218
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
eevacation@gmail.comEmail
jeevacation@gmail.comForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.