Skip to main content
Skip to content
Case File
efta-02317268DOJ Data Set 11Other

EFTA02317268

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02317268
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
JE Punch List — December 18th 2012 1. Clean Up - make as many barge runs as necessary 2. Equipment and Vehicles - Sell equipment - No machinery off the island unless approved 3. Five Palms - Picture Frame (86 x 70) & Canvas on site — contacting framer about coming on site - Mirrored Siding - removed, stripping/stucco complete — final top coat due to start 12/19 4. Berm/Top of Hill — Brice investigating a wood/paper combination material for hydro-seeding - on site, will start using - Pergola construction for high road benches — David — require design details/number from JE 5. Triangle - Installation of lights — to be completed under JE's direction 6. Flagpole Pool Cabana - Furniture — Desk — still in Paris awaiting ETA - Area Rug — JE requested 11/7 either soft white/black design or plain white extra soft rug — Sarah - Lights —JE to review lights at parking area with Danny 7. LS1 Dock - Dock Carpet & New Trim — final trim work to be completed by 11/20 8. Dock Boxes - David will fabricate a lighter lid — sample at MC Pool —JE reviewed — investigating resin/plastic option, up to 4 ft high will forward by 11/20 9. Chillax Room - Media Center — on site — will not handle the weight of the equipment — need to investigate other options 10. Chillax Bathroom - Install Robe Hook on bathroom door —will be installed 11/19 11. Boats - Lady G — sell — will remain at Nanny Cay until sold. LV investigating selling in NJ - Midnight Express — sell — possible buyer on site 12/21 — Purchase 20 ft Nautica/Center Consol — sourcing locally - Purchase New Boat to replace Midnight — require budget 12. AC - Set all air conditioning to 80 degrees 13. Landscaping — Peter's List - Line all Roads with Rocks & Rocks for Waterfall • Rubbish Dump - regrade, berm placement along side road - Transformer area on back high road — plant out - David to make planter boxes — in production, 1 complete — require JE approval. - Relocate 2 palms from Salt Pond to edge of the road near transformer at 5 Palms - Black Heli Under Pads — install at top of bike path at MC — Installation to begin 1/10 - Sea Grape/Citrus Fertilizer/Mulch — where to come with Palms from PR — invoice expected week of 11/17 LV to bring sunflower seeds 14. Roads - General re-grading of roads — ongoing — Peter - JE requested investigating surfaces that can handle the weight of the heavy equipment — gravel option 15. Library - Chiller - all questions have been answered, Rich & Brice working on pricing 16. New Employee Bathrooms - need to finalize finish material with JE EFTA_R1_01219184 EFTA02317268 17. Gym - Shelf — to support bronze sculpture — complete — needs to be raised and base painted same color as walls - Entire Gym will be painted after visit 18. LSJ Mooring — Mooring approved — installation 12/18 19. Hangar - Fuel Containment Pad — via Cecile 11/13 Plan ready for submission, waiting for finalization of VIPA Lease. Tom Melnick unable to complete, sourcing new bid 20. Steel shed — ETA L.S1 12/19 Container will be emptied on L.51 & stored until installation crew on site, Construction crew ETA 1/18 - JE approved layout for extra metal sections & roller doors to old engineering area. Drawings/photos forwarded to Buck Steel 21. Equipment/Household Purchase and Delivery - Italian Deck Chairs — awaiting shipping/delivery details - Pool Towels — on site — JE not happy with "feel" prefers previous towels. Will discuss with Sarah - Pace Clocks ordered 2 units — shipped to incorrect address - reorder 22. Containers — RO & Generators in remaining container — no offers for purchase 24. Stone Walls — Repair work to replace missing loose stones & complete Heli Pad wall — Gerry & Ti need to discuss schedule with JE 25. Heli Pad - Wind sock — to be relocated week of 12/17 26. Cisterns — - Bid approved 11/8 Work to start 1/18 expected completion by 2/6 then back to complete the Great Room cistern late Feb 27. Solar — - Solar Lights — to be placed everywhere under JE's directions - Solar Vendors — require update from Jeanne 29. Movie Screen - - Larry investigating purchase Stewart Screen & new Blue Ray DVD Player 30: Pebble Beach House - - Fan ordered — on site to be installed week of 12/17 EFTA_R1_01219185 EFTA02317269

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2317268
Phone2317269

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.