From: Ann Rodriquez Sent: Thursday, April 27, 2017 10:56 AM To: Rich Kahn Cc: Jeffrey Subject: Staff Cottage: revised work schedule on cottage from Dave Attachments: revised lsj cottage scheduled-a; Untitled attachment 00091.htm David Starofsky 6501 Red Hook PlazaSuite 201 St Thomas VI <=p> Revised Schedule for LS) Cottage=Rmodeling <=p> Apri 29th Start painting i=side kitchen, Laundry and office areas Cannot finish painting rest of a=ea due to electrical panel needs installed and air conditioners need replac=ng. May 1-5th install kitchen cabine=s, exhaust hood for stove, appliances and interior doors. Also Hughes elect=ic will install all plugs and lights for new addition. He was contrac=ed for 4,000.00 with permision from Brice because Danny Vicers did not have=time to complete it. He was not contacted to install new electric panel if Pis needs to be done it will be an additional cost. All electric origi=ally was to be done by in house empoyees. This is based on hardware for do=rs to be bought May 8-12th Finish drywall r=st of area bedroom and living area if AC and Electric panel is installed, w=rk on finishing outside tile and outside deck if plumbing is finished=for downspouts from roof. This is in house work. May 15.19th Finish lose ends unt=l windows, doors and skylights come in. I placed an order for these M=rch 16th and were to be here already. When I called about delivery he=had not ordered them at all so when he ordered them delivery is Nay 19th May 22-May 31 install windows, d=ors and skylights. Then complete tile work inside and out need doors i=stalled to finish tile. Roof and install gutters. Outside new area ready for exter=or painting also have advised that it can be completed two weeks ago=/p> EFTA_R1_01385612 EFTA02376242 Up to this date I have had 76 ho=rs of downtime due to noise which resulted in 280 man hours This is almost t=o weeks of time loss. I am sure that with Anna"s help t= get electric panel resolved , plumbing work done, ac completed and paintin= to be done by in house we can complete this by above date. I have drawn 20,800.00 so far an= balance of 9,200.00 is left. I will hold back 6,200.00 till job comp=eted and draw 3,000.00 to pay employees til job finished. <=iv> Ann R. Begin forwarded message: From: david starofsky Date: April 27, 2=17 at 6:05:57 AM AST To: Ann Rodriquez Subject: rev=sed work schedule on cottage Reply-To: david starofsky 4=lockquote> Anna I have attached a revised schedule for your review. I know th=t with your help on electric panel, plumbing and completing new AC units we=stick to this schedule Also I noted the amount of dow= time due to noise and Mr Epsteins requests. T=ank you for your time and consideration on this Dave<=div> 2 EFTA_R1_01385613 EFTA02376243

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2376242
Phone2376243

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,500+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.