Case File
efta-02436218DOJ Data Set 11OtherEFTA02436218
Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02436218
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
To:
evacation@gmail.com]
From:
Sent:
Fri 8/28/2009 7:52:04 PM
Subject: Fw: Lighting Proposal
Forwarded Messa e
From: Joe Doran
To
Cc: Alan Stopek
Sent: Friday, Augu
PM
Subject: Re:Proposal
The price for the proposed work is based on the following:
1. Supply and install 10 copper bullet flood fights with long shield and 50 watt par 20 flood lamps on 8 palms
on west side of pool and 2 on single palm by cabana. 8 would be mounted on 36" posts
behind
bushes and 2 mounted on 12" posts by cabana.
2. Remove 4 mercury vapor fixtures at west pool and supply and install 4 weatherproof 110volt GFI
receptacles in existing posts.
Labor and material for above. $8400.00
Note: Price does not include trenching and removing plants for install of conduits.
Alan at Efflorescence will provide labor for this part of project. I estimate at least 4 days for 2 men to
complete this at a cost of $864.00.
This is not included in my price and any additional time needed by him to perform this work will be billed at
$18.00 per hour.
I will provide you with a complete written ro
al Monday if you can give me a fax number.
If you have any questions please call
Thanks,
Joe Doran
EFTA_R1_01508610
EFTA02436218
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
evacation@gmail.comPhone
2436218Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.