Skip to main content
Skip to content
Case File
efta-02450771DOJ Data Set 11Other

EFTA02450771

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02450771
Pages
4
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn < Sent: Tuesday, September 20, 2016 6:08 PM To: Jeffrey E. Subject: GSJ bids lets discuss later thanks Richard Kahn HBRK Associates Inc. 575 Lexington =venue 4th Floor New York, NY 10022 tel fax- cell =- Begin forwarded message: From: =/b>Hugo Hodge •c: > Subject: =/b>Re: Date: =/b>September 20, 2016 at 11:52:47 =M EDT To: =/b>Richard Kahn a , The 3rd bidder, =konite, was too high. The Prysmian bid was FOB Norway and the costs to get it to =iami will eat up any savings we see on the surface. On Tue, =ep 20, 2016 at 11:40 AM, Richard Kahn cmailto > wrote: <mailto Thank you. Yes still in meeting. What about =rd bidder. Why key rite when costs are 30 percent higher. Sent from my iPhone On Sep 20, 2016, at 11:32 =M, Hugo Hodge » wrote: EFTA_R1_01549777 EFTA02450771 Good morning Mr. Kahn, Hopefully you are still =eeting with Mr. Epstein. In General.... Prysmian: Delivery: ` Delivery 20 Weeks =in Ex Works =orway Price: 2/0 =625,252.10 or $33.25 per foot 4/0 $716,3745 or $38.10 per foot Reel Charges Non =efundable Reel #1 =88,860.00 Reeltt 2 =44,430.00 FOB Miami Not =ncluded Insulation: 165 =ils Min/205 Mils Max Armor: Galvanized Steel Wires bitumen =oated Experience: Excellent in Europe Marginal in =SA Kerite: Delivery: Delivery 16 Weeks =in 20 Weeks Max FCA =iami Price: ` 2/0 $992,574.20 or $52.79650 per =oot ` 4/0 =1,104,124.00 or $58.730 per foot Reel Charges 100% Refundable =nbsp;See terms 2 EFTA_R1_01549778 EFTA02450772 Reel #1 =100,000.00 per reel Note: I requested a cost =or 100% insulation from Kerite. Insulation: 220 Mils Armor: Jacketed (45 Mil Black HDPE) Galvanized Steel =ire Experience: Excellent in USA Min in =urope I =ecommend going with Kerite Cable, 2/0 cable appears to be sufficient =or this project. This summary only lists the differences in the two =ids. The other portions of the designs are similar and acceptable. I =ecommend that we get a cost from Kerite to Ship the Cables on a Barge =ith Reels and Rigging from Miami and also another cost to install the =able. On the other matter, I have confirmed that smart metering =xists for L.S1 and will be utilized for GSJ. I still owe you a review of =he account and will do that in short order. Best, HH On Tue, =ep 20, 2016 at 10:08 AM, Richard Kahn <mailtola > wrote: can also update me on =mart metering for LSJ and GSJ as we previously discussed thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 tel fax <tel cell <tel 3 EFTA_R1_01549779 EFTA02450773 4 EFTA_R1_0 1549780 EFTA02450774

Technical Artifacts (5)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2450771
Phone2450772
Phone2450773
Phone2450774
Wire RefRefundable

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.