Case File
efta-02490094DOJ Data Set 11OtherEFTA02490094
Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02490094
Pages
4
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From:
jeffrey E. <jeevacation@gmail.com>
Sent:
Friday, August 28, 2015 10:02 PM
To:
Leighton Allenby
Subject:
Re:
i in not sure what the storm has to do with pricing . omar,=buck steel. there is an entire section that has liiitle =f
anyting to do with the storm. ? no updates-. t=ank you for helping with the beach. . see you tomorw =A0
On Fri, Aug 28, 2015 at 5:07 PM, Lei hton Allenby aa href="mailto
target="_blank"
a» wrote:
He=lo Mr. Epstein,
Prepping for the storm has consumed my =ime and the staffs time as well. I cannot control mother nature.
=div>
Omar came over and looked at job on 21st and despite re=eated calls I have not received final pricing. I called
him earlier today =nd now have his square foot price which I will convert to a final number a=ter I look up block cost for
large 250' wall which I measured with Chr=s the other day and its 385' long. I will have this to you this evenin=. Chris said
you wanted this wall two cement blocks wide (running linear b= 10' tall, stone faced on the top and driveway side. The
block side fa=ing the maintenance buildings would be painted. Is=that correct?
I have been on the excavator repai=ing the barge ramp and road access to the driveway to the left of the
boat=dock as it was washed away form the storm and no staff was on LSJ today - =he pricing would have been
completed earlier. I have stopped as the barge =sn't coming over until Wednesday.
Right now no inte=net, we just went back on power and the alarms are sounding in the generat=r panel room
and I am dealing with that....Anna spoke with Danny on phone =was told by Anna Danny said this happens all the time
and he will reset in=the AM). Danny has not returned my text or call. Terrance is working=on the internet problem
remotely and will come over in the AM if he cannot=fix.
I will update the timeline to reflect days m=ssed by staff and storm preparation and cleanup by tomorrow am.
=br>
The barge isn't going to do our runs until Wednesday - t=ey are on one engine
I will put on the timeline t=e # 8 from the update from August 11th meeting - see email below
<=div>
8. Kevin from laredian mentioned that the working d=awings should be completed by the end of September.
They had to have plans=modified for proper venting for carpenters shop and fertilizer/chemical st=rage.
Best,
=tbody>
EFTA_R1_01610925
EFTA02490094
Leighton Allenby ca/span>
Aug 11<=span>
<https://mail.google.com/=ail/u/0/images/cleardot.gif>
<https://mail.google.com/mail/u/0/images/cle=rdot.gif>
3:54 PM (1 hour ago)
to Jeffrey, =A0NYC, Anna, Daphne=/span>
<https://mail.google.com/mail/u/0/images/clear=ot.gif>
Hello Mr. =pstein,
Today Anna, Danny Vicars and I met with David Rosa from CZM an= Kevin from The Jaredian Design Group to
discuss:
1.
Layout of the proposed maintenance and workshop=building project
2.
Two roofs for the RO P=ant and Generator building.
The meeting went well.=Concerns & comments brought up by David Rosa:
1.
New height of RO and Generator roof from across the w=ters. I replied that the pitch of the roof was
aesthetically pleasing and =oof color chosen by you is soft and blends into the skies. He quickly agre=d.
2.
He had no concerns with proposed bui=ding and 80 foot layout and placement of building. We walked
the proposed =ayout that Danny Vicars laid out with orange markers.
3.
David had a complaint from someone that we discussed.=Complaint was that we were creating stone
buffers preventing boaters from =oming ashore to the beaches. I assured him this wasn't happening since=l started and
that there were natural reefs that prevented the boaters fro= coming ashore. He agreed an said that he had to ask as
there was a compla=nt. (Most likely someone saw machines removing rocks from the shore for th= waterfall. We need
to be careful.)
4.
Dav=d wanted to inspect grading of roads. We showed him one of the roads going=from maintenance
building to tennis court and he was pleased.
5.
We discussed putting in drainage swales after the as=halt and minimizing damage and he agreed that
we would have better control=of the water rather than guessing where the drainage swales should be. Dav=d wants
protective erosion control at each new drainage swale per permitt.=l agreed.
6.
We discussed the Coastal Zone=Management Act (CZMA) and why it is important for us to observe this
Act.=C2 http://www.coralreetgov/grants/noaa/USVI-CZMFact=heet-Jun03.pdf
<http://www.coralreef.gov/grants/noaa/USVI-CZMFactsheet-Jun=3.pdf>
7.
David and I discusse= my qualifications, previous projects on coastal zones and my working with=the
Town of Falmouth conservation Department on various projects on Cape C=d. David is from Arlington, VA
8.
Kevi= from Jaredian mentioned that the working drawings should be completed by =he end of
September. They had to have plans modified for proper venting fo= carpenters shop and fertilizer/chemical storage.
9.
Daphne gave me a set of drawings that I will review.
<=i style="margin-left:15px">l asked David if he will sign off on project =nd David commented that most
likely after he reviews the plans once more.<=li>
Best,
Leighton
<https://srl.gstatic.corn/ui/vVicons/mail/images/cleardot.gif>
<=iv class="gmail_extra">
2
EFTA_R1_01610926
EFTA02490095
Leighton Allenby
Director of Properties
a=pan>
On Fri, Aug 28, 2015 at 3:54 PM, jeffrey E. =span dir="ltr"><jeevacation@gmail.com
<mailto:jeevacation@gmail.com> wrote:
timline has changed???? I!! why?
<=iv>
On Fri, =ug 28, 2015 at 2:37 PM, LAIlenby
<mailto
> wrot=:
Drawings by end=of Sept
Leighton Allenby
Director of Properties
<mailto
On Aug =8, 2015, at 2:26 PM, jeffrey E. <jeevacation@gmail.com
<mailto:jeevacation®gmail.co=» wrote:
where are we with all the omar =ids on the timleine , the storm should not have held up =ids ,
same with drawgings for maintenace et.
=div>
=C2 please note
The information contained in this communication =s
confidential, may be attorney-client privileged, may
constitute in=ide information, and is intended only for
the use of the addressee. It =s the property of
JEE
Unauthorized use, disclosure or copying of thi=
communication or any part thereof is strictly prohibited
and may be=unlawful. If you have received this
communication in error, please noti=y us immediately by
return e-mail or by e-mail to jeevacation@gmail.com <mailto:jee=acation@gmail.com> , and
des=roy this communication and all copies thereof,
including all attachment=. copyright -all rights reserved
3
EFTA_R1_01610927
EFTA02490096
please n=te
The information contained in this communication is
confident=al, may be attorney-client privileged, may
constitute inside informatio=, and is intended only for
the use of the addressee. It is the property=of
JEE
Unauthorized use, disclosure or copying of this
communicat=on or any part thereof is strictly prohibited
and may be unlawful. If y=u have received this
communication in error, please notify us immediate=y by
return e-mail or by e-mail to jeevacation@gmail.com <mailto:jeevacation@gmail.=om> , and
destroy this commu=ication and all copies thereof,
including all attachments. copyright -a=l rights reserved
please =ote
The information contained in this communication is confiden=ial, may be attorney-client privileged, may constitute
inside informati=n, and is intended only for the use of the addressee. It is the propert= of JEE Unauthorized use,
disclosure or copying of this communica=ion or any part thereof is strictly prohibited and may be unlawful. If =ou have
received this communication in error, please notify us immediat=ly by return e-mail or by e-mail to
jeevacation@gmail.com <mailto:jeevacation@gmail=com> , and destroy this comm=nication and all copies thereof,
including all attachments. copyright -=11 rights reserved
4
EFTA_R1_01610928
EFTA02490097
Technical Artifacts (12)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
acation@gmail.comEmail
jeevacation@gmail.comPhone
2490094Phone
2490095Phone
2490096Phone
2490097URL
http://www.coralreef.gov/grants/noaa/USVI-CZMFactsheet-Jun=3.pdfURL
http://www.coralreetgov/grants/noaa/USVI-CZMFact=heet-Jun03.pdfURL
https://mail.google.com/=ail/u/0/images/cleardot.gifURL
https://mail.google.com/mail/u/0/images/cle=rdot.gifURL
https://mail.google.com/mail/u/0/images/clear=ot.gifURL
https://srl.gstatic.corn/ui/vVicons/mail/images/cleardot.gifRelated Documents (6)
DOJ Data Set 11OtherUnknown
EFTA02492143
2p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01743996
0p
DOJ Data Set 10OtherUnknown
EFTA01743996
3p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01728258
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01527340
0p
DOJ Data Set 11OtherUnknown
EFTA02215904
9p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.