Skip to main content
Skip to content
Case File
efta-02498267DOJ Data Set 11Other

EFTA02498267

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02498267
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Daphne Wallace Sent: Friday, June 19, 2015 1:44 PM To: Jeffrey Epstein Cc: ann rodriquez; Rich Kahn Subject: Barge return - June 19, 2015 Greetings Sir, The realistic date for t=e return of Big N is Friday, July 31. We spoke wi=h Gene this morning (Gene spoke with Boscoe last night) who summarized for=us the parts to be completed before the barge is ready for sea trials: Old engines removed and stored Engine parts=swapped from old engines to new ones New engines set in pl=ce (old engines loaded for return) Alignment Exhaust s=stem Wiring to the new engines Recondition the transmi=sion Replace the fuel lines Recondition the fuel=filters Sea trials Gene does not forese= any catastrophic setbacks, but at this time he also does not see the comp=etion before the end of July. When we speak with =oyson on Monday, I will request their barge for the mobilization of Better=Roads equipment, and that they work with us as auxiliary until Big N's=return, so this project's schedule is not derailed. Respectfully, Daphne EFTA_R1_01623579 EFTA02498267

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2498267

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,500+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.