Skip to main content
Skip to content
Case File
efta-02583434DOJ Data Set 11Other

EFTA02583434

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02583434
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Lvjet < Sent: Wednesday, May 7, 2014 10:52 PM To: jeevacation@gmail.com Cc: Subject: GIV update Jeffrey, Flight time: TEB - SIT is 3+13min (+34kt tailwind). Test flight on GIV today went well, -I was pleased with Door seal, inflates fully and db lever i= much lower in fwd cockpit area with sound proof material on cabin do=r. -charging dock for stereo remote looks amazing,. / Down wash lights ab=ve credenza have been replaced,./ dish, salt and pepper and several drawer= in galley have dividers installed. -it was tough to find smooth air during todays flight, I brought Julia=, Mx shop manager, most of flight felt smooth, brief moments our light buf=et was present, so I was able to demonstrate to Julian our concerns,. only issue during flight was cockpit windshield heat regu=ator failed, part will arrive 9am tomorrow and should be completed by noon= I'm planning to reposition to Teterboro by 3pm for our departure=/div> let me know if there is a chance you will depart earlier than 6pm? thank you, Larry 1 EFTA_R1_01761654 EFTA02583434

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Emailjeevacation@gmail.com
Phone2583434

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.