From:
michael glidden
Sent:
Tuesday, December 18, 2018 3:15 PM
To:
Cc:
brice gordon; LSJ GSJ; Richard Kahn; Kyle reavis
Subject:
Re: Barge
Good =orning.
With regard to =he barge, 3 weeks is the expected time needed for the exhaust work, the =ub rail installation, and also
inspect and address rudder alignment =long with propeller inspections. There is also a list of general =aintenance items
Boscoe has that can be attended to while out of the =ater for that 3 weeks.
With regard to the scope of electrical work to be done there =re two items on LSJ that will be done with a combination
of in house =abor and local contractors. They would be the duc bank from the =enerator building to the sea water intake
building that will include =he new fiber for the desal system and the repair of the 5 palms =lectric and fiber feeds due to
your request that the work be done as =oon as possible.
The material for the duc =ank is on island and the material list for 5 palms is going out today =or pricing. I was going to
have LS1 purchase all the material and have = local contractor install for which I am going to get two =rices.
The only area where the amount of potential =ork is likely to interest a stateside company would be GSJ.
The issue with getting bids at this point is any scope =f work that may be put into a list is simply an idea with no
=ngineering or design to base an actual bid on.
Before you can issue a scope of work to be bid on there needs =o be a considerable amount of time and money spent
with an engineering =nd design firm to produce drawings and/or designs, on paper, that =ontractors can then put a
dollar figure to.
I =eached out to Springline for this specific purpose and they declined =as have Jaredian Design.
A stateside =ontractor may be interested in doing design-build and maybe that would =e a path to explore but I do not
have any connection with a company of =hat type.
On Dec =7, 2018, at 4:31 PM, 1 <jeevacation@gmail.com <mailto:jeevacation@gmail.com> wrote:
how many days neeeded. . what work still =equired barge. other boats ready
more =nportantly is where is
the scope of elecrtic jobs needed =s we discussed a week aglo
On Mon, Dec 17, 2018 =t 2:45 PM michael glidden
> wrote:
Good day.
Is there any update as to when scheduling can be made for the =aintenance and exhaust work needing
to be done on Big N =
please note
EFTA_R1_01804166
EFTA02609987
The information contained in this =ommunication is
confidential, may be attorney-client =rivileged, may
constitute inside information, and is =ntended only for
the use of the addressee. It is the =roperty of
JEE
Unauthorized use, disclosure =r copying of this
communication or any part thereof is =trictly prohibited
and may be unlawful. If you have =eceived this
communication in error, please notify us =mmediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this =ommunication and all copies thereof,
including all =ttachments. copyright -all rights reserved
2
EFTA_R1_01804167
EFTA02609988
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
jeevacation@gmail.comPhone
2609987Phone
2609988Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.