Skip to main content
Skip to content
Case File
efta-02648890DOJ Data Set 11Other

EFTA02648890

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02648890
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: jeffrey E. <jeevacation@gmail.com> Sent: Wednesday, May 17, 2017 10:55 AM To: . Subject: send to bob Dear Darren, Further t= the emails below, we have now discussed the points raised with Royal Jet.=/span> To keep matters moving forward, please find attached a revised draft of the Aircraft Purchase Agreement (in clean and red-line against the last draft) (which remains subject to the further review of Royal let).4=iv> Please note the following: 1. =C2440=A0Section 1.2: Royal Jet have agreed that all 3 engines may undergo the boroscopic examinations at the same time prior to the main pre-purchase inspection. Royal Jet will require that, at the least, those examinations follow the inspection process for the aircraft itself in that the engines should be accepted if they are in the Delivery Condition (rather than there being a wider discretion). Note that Roy=l Jet are incurring costs in grounding two aircraft to complete these examinations and potential swaps and that the inspection process is already in the Purchaser's favour given it is rare there is no discrepancy requiring rectification. 2. =b>Section 3(c)=/span>:40=A0 Royal Jet accepts that the Purchaser will not have complete control over Etihad, so we have made the requirement to commence the inspection by 18 De=ember subject to the availability of Etihad. As a general point, it is important that we finalise the Aircraft Purchase Agreement and confirm this slot quickly so we do not lose it. </=pan> 3. Section 3=d):=C2*Boroscopic examinations of the engines are now excluded from the main pre-purchase inspection given they will already have been carried out. 4. =C24, Section 3(e): Royal Jet will permit further flight tests to be carried out, but if they are not necessary as per manufacturer's maintenance manual for release to service then the Purchaser should pay for them. 5. =C2.4>=A0Section 3(f): Royal Jet has agreed to remove the time =imit on provision of the inspection report (so it will simply be provided =quotas soon as is reasonably practicable"). 6. =/span>Section 14(a): Given we have not made any progress in inserting an actual amount for the combined single limit, in order to move this forward, we have simply made reference to a market standard amount. •=A0 7. Sect=on 15(f): We have corrected the typos referenced below. We will forward the aircraft specs and inspection scope to you once received from Royal Jet. Once those are inserted, we should be able t= put the Aircraft Purchase Agreement into execution form and proceed with signing. We look=forward to hearing from you. Kind regards, EFTA_R1_01888127 EFTA02648890 conversation-id 43785 date-last-viewed 0 date-received 1495018471 flags 8590195713 gmail-label-ids 7 remote-id 714704 2 EFTA_R1_01888128 EFTA02648891

Technical Artifacts (6)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Emailjeevacation@gmail.com
Phone2648890
Phone2648891
Phone5018471
Wire Refreference
Wire Refreferenced

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.