Leighton Allenby
Sent:
Thursday, August 27, 2015 11:16 AM
To:
Jeffrey Epstein
Cc:
NYC - Richard Kahn; NES - Merwin Dela Cruz; Leighton Allenby
Subject:
NES: Local Law 11 Cycle 8A Report & Costs
Attachments:
NES Local law 11 report 2015.pdf, 9E71_tr6(1).pdf
Hello Mr. Epstein,
Attached is the Facade Inspec=ion & Safety Program Local Law 11 Cycle 8A Report with recommendations=for repairs
for 9 East 71st Street in NYC.
The re=ort gave us a safe finding and no immediate recommendations are required w=thin the next 5 years. After
reviewing with Rich and Merwin it was decided=to obtain a bid from Herbert Rose, inc for the following items as a
preven=ive measure to preserve the integrity of the building rather than wait and=have costly repairs in the near future.
Water will penetrate cracked areas=and cause much damage. I feel that it is best to correct these items rathe= than
wait.
We received a bid from Herbert Rose f=r &19,000. and negotiated to $17,600. for the following repairs:
=div>
Repairs recommended by:
1.
Page 9 - photo 6: there is a c=ack along motor joint that should be caulked. Remove existing stone =atch and
prepare stone for new patch
2.
Pa=e 10 - photo 8 & 9: Cut and point all cross at water joints at w=ter table
3.
Page 11- photo 10: Cle=n cracked joint in flat copper water table joint (two locations) and insta=l new Kemper
strip over each joint.
4.
Pag= 12 - photo 12: Clean rust area. Prime and paint. Clean and reseal railing=connection into stone wall
5.
Page 14 - ph=to 16 : The bottom right bracket bolt is rusting/replace bolt and check br=cket. Install working
basket in the bulkhead wall and go down to replace e=isting chimney anchors with new stainless anchors.
6.
Install sidewalk bridge on south facade. (at main entrance) =A0approx. 1/2 the cost of proposal
7.
N.Y.= sales tax not included in price
8.
Projec= Timeline
1.
two weeks notice to comme=ce
2.
four men / 2 to 3 weeks from start t= completion
Rich mentioned that you wanted no work into=the middle of October. We both collectively thought this was a fair
price.=/div> Would you like this scheduled for then? Please let me know how y=u want to proceed.
=est,
Leighton
EFTA_R1_02111021
EFTA02708618
Le=ghton Allenby
Director of Properties
2
EFTA_R1_02111022
EFTA02708619
Technical Artifacts (4)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
2111021Phone
2111022Phone
2708618Phone
2708619Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.