From: Richard Kahn Sent: Thursday, June 18, 2015 9:25 PM To: jeffrey E. Subject: Fwd: Garage Roof Building Construction - June 18, 2015 Attachments: Allied Steel proposal.pdf; Untitled attachment 00567.htm; Buck Steel proposal.pdf; Untitled attachment 00570.htm; MBMI proposal.pdf; Untitled attachment 00573.htm attached are 3 bids MBMI bid has a color =watch for your review i have not negotiated any of =ids yet and cost of building erection still needs to be determined =buck steel estimated 36,000) Richard =ahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 to fa Begin forwarded message: Date: =/b>June 18, 2015 at 5:03:00 PM =DT Subject: =/b>Garage Roof =uilding Construction - June 18, 2015 From: =/b>Daphne Wallace To: Rich Kahn , ann rodriquez Pertaining=to your request to get a Jaredian schedule of purchase on =onstruction. The company that will be fabricating the steel =uilding must be chosen in order to proceed. Once the fabricator =s selected, Jaredian will then complete the foundation drawings =include other pertinent information needed for actual construction), =eview with the fabricator, and the building can then be =rdered. Below is a breakdown into 3 =ategories the components needed for the schedule: the Steel Building cost proposal, =osts of shipping and delivery to LSJ, and the selection of the General =ontractor and/or crew responsible for constructing and/or obtaining quotes for =nstallation: EFTA_R1_02126857 EFTA02711756 Steel Building Cost proposal should include: Design - Stamped construction plans which follow the International =uilding Code that can be filed with DPNR to obtain a Building Permit - =hese plans will show the J-bolt layout and the building's structural =eactions Structural steel (Super structure) and Purlins - 24 gauge =teel recommended Metal Siding (Sheathing) and Roofing - =4 gauge steel recommended Overhead Rolling Doors - rated =o 140 mph winds Metal pedestrian doors - rated to 140 mph winds Full =ange of color options - Kynar 500 Finish recommended Owner (LSJ) will coordinate/obtain =uotes: Shipping (Tropical Shipping) Erection (TBD) General Contractor (TBD): Earthwork Concrete foundations Electrical Plumbing and/or Mechanical Systems Three companies were vetted and =uotes were obtained. Listed below are their proposals, which include =he parameters outlined above, delivered to the port of Palm =each: Allied Steel : $112,747.00 Buck Steel: $126,640.00 MBMI: $ 84,992.00 (note: steel is 26 gauge Super Spanex =anel) Copies =f all three proposals are attached for your review. 2 EFTA_R1_021 26858 EFTA02711757

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2126857
Phone2711756
Phone2711757

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,500+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.