Skip to main content
Skip to content
Case File
efta-efta00628144DOJ Data Set 9Other

DS9 Document EFTA00628144

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00628144
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: To: "Je vacation" alla> Subject: Apu GIV upgrade Date: Mon, 22 Apr 2013 16:49:02 +0000 Importance: Normal Jeffrey, Rusty is working on GIV type rating options if we agree to cockpit upgrade, should have answer in couple of hours. -inspections are complete, only remaining open inspection item is flap track micrometer measurements to verily they are in limits, since flaps are removed. -we have several items we will address for repair such as: -nose of radome requires honeycomb repair on tip of radome, will be fixed locally. -auto throttle rigging throttle split -air pressure High pressure inlet guide vane adjustment, air cycle machine item. -DC voltage panel -new flap actuator install. Separate note: we need to install the loaner APU for engine runs and continued trouble shooting on engines. Do you approve of APU upgrade so I may sign contract for upgrade so APU loaner could be installed today? Darren and Dennis will modify contract. Do you agree to proceed with APU upgrade? -$211,000 for upgrade, Dennis pays $115,000 of this amount and labor to remove and install loaner., Thank you, Larry Sent via BlackBerry by AT&T EFTA00628144

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.