Skip to main content
Skip to content
Case File
efta-efta00641903DOJ Data Set 9Other

From: Daphne Wallace

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00641903
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Daphne Wallace To: Jeffrey Epstein <jeevacation@gmail.com> Cc: brice gordon cta, Subject: Danny's Report of activities for the last two weeks - August 10, 2012 Date: Fri, 10 Aug 2012 19:00:02 +0000 Greetings Mr. Epstein, Below for your review and comments, Danny has outlined the projects that the staff has been working on for the period 7/30/12 - 8/10/12: 7/30 - 8/03/12 Clement and Benny: fabricated the 5 doors for the Engineering shed bays - this was a time-consuming task because they milled and created the tongue-n-grove - the lumber for this project was recycled lumber that was on site. Gary and TJ - redid the berm's stone threshold, painted the woodshop Sharimo - repaired several of the gators Jules - worked on road compaction, replaced the berm boulders, crane operator for the batch plant removal Brian, Sheridan, Karl - removed the equipment out of the tunnel so the floor could be epoxyed Peter and landscaping crew - replanted half of the sundial where the trees died, tied down the palms for hurricane PreP Lester - captained the boats and barge, assisted with Little C's engine removal and the removal of the batch plant. Guy - renewed a 3" water line, assisted in all of the barge runs, repaired the hoses in the barge bilge. Boscoe, Carlos - on vacation Dulce, Katie, Sandra - household maintenance, secured the shutters on the doors throughout the main compound as part of the hurricane prep Cuthbert (Smiley) - pool maintenance, RO, fuel and electrical readings 8/06 - 8/10/12 Clement and Benny: hung all the doors in the Engineering shed bays, fabricated the shelving, completed the plasterwork around the doorframes. Gary and TJ - painted and caulked all five Engineering shed bays, assisted in the plasterwork around the door frames. Brian - built the Engineering shed outer wall, epoxyed the floors of the Engineering shed, assisted Boscoe with loading the Office trailer on the barge, epoxy, cleaned up the area where the office trailer used to sit, epoxying the floors of the first 3 bays Sharimo, Sheridan, Karl - general vehicle and equipment maintenance and repairs EFTA00641903 Jules - prepared potential site on Beach 3 for JE review, restored Beach 3, removed old road down to Engineering, assisted with Office trialer removal Peter and landscaping crew - install rebar for 5 Palms palms tie down, inside berm rock removal and cleanup, general landscaping maintenance Lester - on leave first 3 days, transported the Office trailer to St. Thomas Guy - assisted Danny with re-wiring the Engineering shed bays, barge mate, assisted Boscoe with barge repairs, assisted Clement with erecting the subwall in one of the Engineering bays, assisted with the removal of the Office trailer on St. Thomas. Boscoe - barge repairs, barge runs in Lester's absence, researching quotes for Big N project and vehicle and equipment repairs, removed the Office trailer to the barge Carlos - boat captain, shopping, clearing cargo, researching quotes for various projects Dulce, Katie, Sandra - household maintenance Smiley - water maintenance, electrical and fuel readings Respectfully submitted, Daphne EFTA00641904

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Emailjeevacation@gmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.