Skip to main content
Skip to content
Case File
efta-efta00660199DOJ Data Set 9Other

From: BMG

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00660199
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: BMG To: J Epstein <jeevacation@gmail.com> Subject: Fwd: Re: Date: Mon, 23 Apr 2012 13:15:40 +0000 Sent from my iPhone Begin forwarded message: From: Date: April 22, 2012 10:43:30 AM GMT-04:00 To: brice gordon Cc: Arran Mc Ginnis TOM MELNICK < >, Daphne Wallace Subject: Re: Good Morning to All, Please note below - changes/additions/updates. Daphne could you please update the Punch List to reflect these points, please call if you require more details Wannest regards always On Sun, Apr 22, 2012 at 10:14 AM, On Sat, Apr 21, 2012 at 4:35 PM, > wrote: > wrote: 5 Palms - Desk to be sent from NYC - Sarah will make arrangements Outside Light Boxes on back & front walls to be covered over Lights - light Parrots and building - from roof line (retangler 24 x 10) lighting to be installed in ceiling - 4/23 Outside Coral stone seat - Brice will forward changes to Tom Retaining Wall requires layout Concrete Benches need placement Grade require flatten/building up Relocate grasses from Beach - JE will select location Generator Pad - 24th Mirrored Siding due on site 4/24 Cabinets/Shelves - to be completed by Bill Doors - will confirm delivery date 4/23 Fire Box - requires construction with Mexician Tile on floor area Painting - Final outside coat to be completed once all work as finished Level Dirt/Trees - 30th Grotto - Road to mimic Starfish Market EFTA00660199 Concrete pour 23th - complete 25th More dirt required on left hand side as you look down, then hydroseed Shutters/Generator Doors/Storage Doors - to be completed by John Flagpole Pool - Palm lighting starts 4/23 Bern - Crusher Runs, place inside Berm Area 50 Planter Boxes require construction - size to be determined by JE Relocate Tie Downs to Engineering Main Compound - Plant Goats Foot Vine on hillside Repairing of coral stone deck areas Coral Stone Threshold's in guests rooms need to be cut Table on dock - final size to be determined - to be completed by John coral stone top Dock - Redo entry. Brice to source dock wood locally Enginerring - Area needs to be leveled and metal shed to be laid out Old Floating Dock - move to high road Hanger - 2 x Queen Beds/Frames - purchase 4/26 Coconut Drawers, relocate to Hanger 4/26 LSJ,LW Island Manager 6100 Red Hook Quarters Suite B3 St Thomas USVI 00802 Tel: Fax: LSJ, LLC Island Manager 6100 Red Hook Quarters Suite B3 St Thomas USVI 00802 Tel: Fax: EFTA00660200 LSJ,LLC Island Manager 6100 Red Hook Quarters Suite B3 St Thomas USVI 00802 Tel: Fax: EFTA00660201

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Emailjeevacation@gmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.