Skip to main content
Skip to content

Duplicate Document

This document appears to be a copy. The original version is:

From: "Gary Kerney" ‹
Case File
efta-efta00746459DOJ Data Set 9Other

From: "Gary Kerney" ‹

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00746459
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit
Review This Document

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: "Gary Kerney" ‹ > To: "Jeffrey Epstein" <jeevaeationggmail.com> Cc: , < , "Dou Schoettle" , "William Rowles" Subject: Date: Sun, 13 Jun 2010 14:34:57 +0000 Status of projects and outstanding issues for Jeffrey underlined LIBRARY Status interior 1.interiors complete by construction Outstanding issues 1.ceiling treatment 2.cabinet finishes &floor finishes Status exterior 1.courtyard paving underway complete by the July 31 2.irragation main line underway complete by July 15 Outstanding issues 1.landscape plans a.plants b.irragatiion plans c.lighting_ 21gala has trees tagged ready for delivery as soon as barge is ready MASTER SUITE Status interior 1.const under way ,subject to decisions being made should finish by Oct 31 Outstanding issues 1.steam bench 2.out side shower 3.lites over bed 4.lighting in bedroom 5.electrical in bath area 6.tub deck and surround 7.selection of wood floor 8.sourcing thassos slabs 9.powderroom vanity plan 10.shop drawings for stone Status exterior EFTA00746459 1.wall under way, complete by Aug 31 Outstanding issues 1.landscape plans .liting irr. KITCHEN Status 1.assume we get permit by July 1 should be complete by Nov.31 Outstanding issues 1.kitchen design 2.stair and wall design to master LAUNDRY 1.assume we get permit July 1 should complete by Oct 31 COTTAGES 1.const underway should complete by Sept 30 Outstanding issues 1.shower design MAIN HOUSE REMODEL Status no estimate to compleation til program complete 1.courtyard side plan final,proceeding 2.roofing proceeding Outstanding issues 1.north side program MECHINICAL ELECTRICAL Status under way should complete by Sept 30 MECHANICAL DESAL Status under way should complete by Nov 30 POOUTHEATER 1.Gensler allow three months for plans 2.two months for permits Nov 30 3.pool by Mar 31 4. theater by Jun 30 EFTA00746460

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainjeevaeationggmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,500+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.