Skip to main content
Skip to content
Case File
efta-efta00775455DOJ Data Set 9Other

From: "Stephen Caplinger" <I

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00775455
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: "Stephen Caplinger" <I To: "'Gary Kemey"' Cc: <1 >, "'Jeffrey Epstein" <jeevacation@gmail.com> Subject: FW: Revised Master Budget Date: Fri, 05 Jun 2009 21:38:29 +0000 Attachments: master suite_06-05-09_final_Sheettpdf; master suite_06-05-09final_Master Suite.pdf Inline-Images: image00 1 .jpg Gary: See below from Jeffrey STEPHEN M. CAPLINGER Vice President Design & Planning LANDMARK LAND COMPANY 4908 Brooksview Circle New Albany, Ohio 43054 From: Jeffrey Epstein [mailto:jeevacation@gmail.com] Sent: Friday, June 05, 2009 5:31 PM To: Stephen Caplinger Subject: Fwd: Revised Master Budget can you send this on to gary Forwarded message From: curtis Date: Fri, Jun 5, 2009 at 5:22 PM Subject: Revised Master Budget To: JEE <jeevacation@gmail.com>, Brice Gordon <1 >, Darren Indyke k's EFTA00775455 Jeffrey - as per your request I did the entire Master bedroom budget from scratch with new take offs. • I specified as much as I could based on the existing brands of plumbing and lighting equipment. • I used all LSJ labor including Gary for the electrician and Brian for the plumber - Glidden agreed to sign off on Gary's work, I have not got a professional to sign off for the plumbing as of yet. • Gensler has not reviewed the HVAC system I specified with Dave Gott, but I'm confident that their specifications will not be much different. • Gensler has not specified the roof yet and I am not entirely sure theirs will be equivalent, the one specified in this budget is based on the Office Pavilion, which in my opinion was over designed. • The paint finish is a simple in house job and does not account for a Pinto or designer look. No paint in the bedroom because this requires some designer repairs. • All stone floors and walls are Coral stone. • Existing bedroom floor to remain but I have allowed for refinishing. • All lighting and switching in the Bedroom will remain as is. • I HAVE NO SHIPPING included in this budget, I did not have time to run it all past Emad, which I will do next week. Curtis EFTA00775456

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Emailjeevacation@gmail.com
Wire Refrefinishing

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.