Skip to main content
Skip to content
Case File
efta-efta00807351DOJ Data Set 9Other

[Last Name]

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00807351
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
[Last Name] Peter Elie Box 307801 St. Thomas, USVI 00803 February 1, 2019 Cell: 340-201-4791 Estimate materials or Pebble Beach Contraction 1.) 20 sheets of 1/4 ply form 2.) 200 stir-ups 9x9 3.) 50 2x4 by 12 ft 4.) 1 box double head nails 3 'A 5.) 1 box grabber crews 3 inches 6.) 1 box grabber screws 1 'A 7.) 5 lbs Tap corn screws 3 inches EFTA00807351 [Last Name) 2 Peter Elie Labor Cost for Pebble Beach Foundation and slab $ 7,500 Columns + $ 6,500 Total- $14, 000 Roof ? EFTA00807352

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone340-201-4791

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.