Skip to main content
Skip to content
Case File
efta-efta00881884DOJ Data Set 9Other

From: Jeffrey Epstein <jeevacationggmail.com>

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00881884
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Jeffrey Epstein <jeevacationggmail.com> To: Silvina Royston Subject: Re: Gensler Proposal for Final Approval Date: Thu, 30 Apr 2009 21:38:21 +0000 yes On Thu, Apr 30, 2009 at 11:15 AM, Silvina Royston < > wrote: Jeffrey, We have been working with Warwick Wicksman at Gensler for almost two months revising and refining the proposed scope of work and their fees for them and their Consultants. It is now ready for your review and approval. Darren has been provided with a copy. The proposal and fee is divided into 5 areas: 1. Expanded House Compound and Pool Area- Gensler will provide: • Architectural Services for all phases with Structural, Mechanical, Acoustical, Lighting, A/V, Waterproofing, Landscape and Pool Consultants • Interiors for Screening Room Only • Coordination with Owner's Own Interior Designer, and inclusion into plan documents. $937,750 There may be an option where we may be able to deduct $44,000 from Pool Consultant if we have Pool Subcontractor do CD and CA. $893,750 2. AN Garage- Gensler will provide: • Architectural Services for all phases with Structural and Mechanical Consultants $20,000 3. Existing House Compound- Gensler will provide: • Coordination with Structural, Mechanical and Waterproofing Consultants • New construction specifications will be same for renovation of the existing $23,500 4. Dock House- Gensler will provide: • Architectural Services through Schematic Design • Coordination with Owner's Own Marine/Dock Builder for DD and CD phase EFTA00881884 $22,000 5. Landscaping in front of Dock area and Path to Office Pavilion-Gensler will provide: • Architectural Services-SD/DD and CA with Landscape Architect $0 TOTAL: $959,250 Including full scope for Pool Consultants $1,003,250 Including reduced scope for Pool Consultants Gensler is currently working on a draft contract based on the above which will be submitted to Darren for review and revision. As Gensler will be submitting their Design Development package in approximately two weeks: It is my recommendation that we provide Gensler with (2) checks for: • $20,000 Balance due on Gensler DD retainer. $30,000 paid. • $37,187.50 50% of SD Retainer for Consultants for areas 1-5 as noted above. This will provide us access to: • Mechanical and Waterproofing Engineers to provide specifications for the Master and Kitchen Renovation AC and roofing system. • Landscape Architect to design for the Path to the Office Pavilion and for Dock Entry May I proceed with processing these (2) checks? Regards, Silvina EFTA00881885

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainjeevacationggmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,500+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.