Date: Tue, 28 Aug 2018 12:40:40 +0000
Regarding barge ramp expansion
Attached e mail from Mike. G for you reference
French drains are going installed around both the barge ramp and shelter
Expanding ramp toward the shelter would pinch drainage field
Can we proceed with existing barge ramp size ?
Sent from my iPhone
Begin forwarded message:
From: michael glidden <
Date: August 28, 2018 at 8:26:20 AM AST
To: brice gordon
Cc: Kyle reavis
Subject: Barge ramp
>
Good morning Brice.
Regarding the proposed expansion of the barge ramp towards the dock structure I would like to remind you of
the intent to install two separate French drain systems around each of the concrete structures on the beach.
The material has already been ordered and sized for each structure individually. If the barge ramp were to
expand to the edge of the dock slab the flow of runoff would be pinched considerably when we get heavy rains.
As it is the ramp has been enlarged over the original and there is no need to expand it further.
Thanks,
MG.
EFTA01026607
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
jeevacation@gmail.comWire Ref
referenceForum Discussions
This document was digitized, indexed, and cross-referenced with 1,500+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.