Skip to main content
Skip to content
Case File
efta-efta01058091DOJ Data Set 9Other

From: Amy Claire Dempsey <

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01058091
Pages
4
Persons
0
Integrity

Summary

Ask AI About This Document

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Amy Claire Dempsey < To: "jeffrey E." <jeevacation@grnail.com> Cc: "John P. Woods" • Subject: Re: GSJ Permit Date: Mon, 26 Dec 2016 14:17:56 +0000 Our locations are well away from all legal mornings. There's been a guy who lives on his boat who has moved over here occasionally when he gets ran off from in front of Ritz. Enforcement is constantly following him around making him move. Sent from my iPad Amy Claire Dempsey President Bioimpact, Inc M. Box 132 Kingshill, St. Croix VI 00851 On Dec 22, 2016, at 9:27 AM, jeffrey E. <jeevacation@gmail.corn> wrote: no mooring locatated there, no public access. it is a private dock. and the only deep water , that s the main consideration On Thu, Dec 22, 2016 at 9:22 AM, John P. Woods < > wrote: I Amy, Actually, I don't think he is questioning two dock locations; I think he preferred one to be where the existing one is and the other across from LSJ. With the existing site being out of the way, Christmas Cove should be ok. All I am saying is we will have to be tight on the design considerations and environmental factors. Consultation with the ACOE will certainly help that. I recommend we collectively review the design package and discuss how these facilities, particularly in Christmas Cove, will be managed. I feel we will be questioned heavily on whether the public will be able to pull dinghies up to the dock in Christmas Cove. We have to also address whether there will be any displacement of existing moorings because of that dock. JPW From: Amy Dempsey [mailto: Sent: Thursday, December 22, 2016 10:03 AM To: John P. Woods Cc: Jeffrey E.; Darren Indyke; John P. Woods; Erika Kellerhals Subject: Re: GSJ Permit EFTA01058091 First: The barge landing proposed has almost negligible impact and the federal agencies really liked it. As to the Chrstmas Cove dock, it is the most protected of all the docks far more so than the LSJ site as far as most common wave approach. It is protected by STT, Cow and Calf, the small off shore cay and all the other rocks out there. JP has not taken a lot of time to look at it and probably was just shooting from hip. I have attached a drawing showing the only wave approach that would directly effect the site. And we can pull the HINDCAST buoy data and show how infrequently it occurs. I should sit down with JP and go through all the proposed locations and the impacts and designs of each and why they are the way they are to address impacts. The federal agencies liked all the locations chosen. Theyre concern was as his, why two access docks. Amy Claire Dempsey, M. President, Bioimpact, Inc Box 132 Kingshill St. Croix, U.S. Virgin Islands 00851 344) 690-8445 Fax 340 718-3800 hioimpact@islands.vi, On Wed, Dec 21, 2016 at 10:13 PM, John P. Woods wrote: Good Evening, I met with J.P. Oriol yesterday to discuss the drawings that we will be submitting to in essence replace the unexecuted permit that will ultimately serve as a "master plan" for the island. We discussed what needs to be included in the drawings and I came away with the following points: I. A helipad, by VI Code Title 29 Section 226, paragraph (h) requires a helipad to be approved by DPNR, Public Works, VI Port Authority, and the VI Legislature. It is my understanding we are not asking for a helipad, but a concrete pad/terrace that may be used as a landing site. J.P. feels we should apply for this site separately as it could hold up the rest of the scope. What I feel we need to do is state clearly in the description of the pad it is not a helipad. We should further state that in the future it may be used as a landing site, at which time we will apply for all "necessary" permits. Of course we don't believe any other special permit is required other than a determination that a rook is not within 1000 feet of the site. I strongly recommend Amy do that study now to make that determination. EFTA01058092 2. Access on to the island is important to define now. J.P. seems to feel the existing dock site should remain and supplement it with the dock across from LSJ. He has concerns about the dock in Christmas Cove and the temporary barge landing regarding their ability to withstand Winter swells on the Western side of the island. He also feels the barge landing should be incorporated into one of the dock sites as it is on LSJ. Amy has already said the ACOE does not like the existing dock site, so that is out. The marine facilities on the western side will need to evaluate wave activity throughout the year to validate the western sites. We don't have to show these access points at this stage, but they should be seriously considered as it relates to where we are placing structures like storage and maintenance sheds. 3. DPNR will likely stand by their interpretation of the height of the flagpoles. We will need to apply for a variance from BLUA to try and get the height waived. Erika, let's work on that. I think the basis should be the inconsistency I referenced in my earlier correspondence to the Commissioner. 4. I have defined the work scope into two phases. The first phase deals with cleanup, stabilization of existing driveways, landscaping, flagpoles, concrete pads, and new driveways. Phase 2 consists of structures such as residential cottages, pools, and storage buildings. We are doing that separation because we don't have enough definition on the buildings to get them fully permitted. We would also need complete plans, elevations, and sections. We can, however, get them approved conceptually with special conditions that will require us to submit more complete drawings when we are ready to construct those buildings. 5. We can request this new scope replace the scope of the unexecuted permit. This will save a lot of time, if they accept it. The inclusion of new driveways will be the impetus to request modifying the limitations on types of equipment that can be used. I intend to make the submission over the next days, depending upon the VI Gov. holiday schedule. Once approved, modifications and additions to the scope will be easier to receive and take less time than acquiring multiple CZM permits. JPW Sent from my iPhone This email has been checked for viruses by Avast antivirus software. Avast logo please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by EFTA01058093 return e-mail or by e-mail to jeevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA01058094

Technical Artifacts (8)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Emailhioimpact@islands.vi
Emailjeevacation@gmail.com
Emailjeevacation@gmail.corn
Emailjeevacation@grnail.com
FaxFax 340 718-3800
Phone340 718-3800
Phone344) 690-8445
Wire Refreferenced

Related Documents (6)

DOJ Data Set 10OtherUnknown

EFTA01298025

19p
DOJ Data Set 10CorrespondenceUnknown

EFTA Document EFTA01380998

0p
Dept. of JusticeOtherUnknown

EFTA Document EFTA01374712

From: Stew Sent: 1 30 2019 9:16:41 AM To: BCC: Subject: account summary Importance: High Rich, as discussed I've listed the entities we associate with Jeffrey's relationship here. We've closed some of these already, but help ul to have the full list I hope. Thanks Butterfly Trust Authorized Signer Harry Beller Authorized Signer Erika Kellerhals Darren L. Indyke PLLC Authorized Signer Darren K. Indyke Epstein, Jeffrey E. Authorized Signer Jeffrey E. Epstein Authori

1p
Dept. of JusticeOtherUnknown

EFTA Document EFTA01363465

KYC 1790739 — Gratitude America - comments made on research for all parties. Please review and edit where necessary. Searches have been completed for the required KYC parties. Photo ID for Darren Indyke is expired, found under GCIS# 487199. Signature card confirms Jeffrey Epstein and Darren Indyke as the signor's on the account. Please make sure that compliance has given clearance on RDC & PCR Alert for customer. KYC 1790748 - Neptune, LLC- comments made on research for all parties. Please r

1p
Dept. of JusticeOtherUnknown

EFTA Document EFTA01417448

7/15/2019 KYC Print DB PWM GLOBAL KYC/NCA: PART A KYC Case # : 01344537 One sheet must be established per relationship - list all accounts included in the relationship 1. Relationship Details Relationship Name: Relationship Manager: EPSTEIN, JEFFREY RELATIONSHIP:00000483290 Paul Morris New PWM Relationship Relationship to PWM: If existing, please indicate since when the relationship exists, provide reason for new profile and attach old profile: Update of KYC #01133113. Trustees ha

44p
Dept. of JusticeOtherUnknown

EFTA Document EFTA01297516

THE 2013 BUTTERFLY TRUST DELETION AND ADDITION OF BENEFICIARIES Pursuant to Article Third, Paragraph B of that certain Trust Agreement, dated December 31, 2013 (the "Trust Agreement"), between JEFFREY E. EPSTEIN, as Grantor (the "Grantor"), and ERIKA KELLERHALS and RICHARD KAHN, as Trustees, of The 2013 Butterfly Trust (the "Trust"), the then acting trustees of the Trust, acting jointly, have the right, during the lifetime of the Grantor, to delete and add beneficiaries under Article Thir

4p

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,500+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.