Skip to main content
Skip to content
Case File
efta-efta01087970DOJ Data Set 9Other

DS9 Document EFTA01087970

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01087970
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
a ALTILROADS ASPHALT CORP Construction Proposal August 5, 2015 Between the Owner: LSJ Little St. James Island St. Thomas, VI And the Contractor: For the Project: Betteroads Asphalt LLC PO Box 301946 St. Thomas, VI 00803 1-8593-1L LSJ Roadway/Pathway Drainage Measures Little St. James Island USVI SCOPE OF WORK: Excavate for and place 32 concrete swales with rip rap detention areas as shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18, 2014. Each proposed area contains the following; • Concrete Swale measuring 6ft. (W) x 12ft. (L) x 4in. (D) Aggregate Base Pad measuring 6ft. (W) x I2ft. (L) x 3M. (D) • Rip Rap Detention Area measuring 8ft. (W) x 8ft. (W) x 6in. (D) TOTAL BASE PRICE: $42,062.40 LSJ Roadway/Pathway Drainage Measures August 5, 2015 I of 2 EFTA01087970 A IIITTIROADS ASP14ALT CORP. Project Totals: Name Quantity Unit Cost Road Drainage Measures Unit Total Cost Concrete swale 32 $855.00 Ea. $27,360.00 Aggregate Base Pad 32 $138.00 Ea. $4,416.00 Rip Rap Detention Area 32 $150.00 Ea. $4,800.00 Company Overhead & Margin a Company Overhead Percentage 15.00% S0.00 Percent of Costs $5,486.40 Grand Total an $42,062.40 LSJ Roadway/Pathway Drainage Measures August 5, 2015 2 of 2 EFTA01087971

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.