Skip to main content
Skip to content
Case File
efta-efta01089430DOJ Data Set 9Other

DS9 Document EFTA01089430

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01089430
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
E D C B A 2 REST R CONTAINMENT WA FUEL TAN 2 FUEL PUMPS 3 EXISTING STORAGF BUILDING AND CISTERN SCALE - 1- • 30• SITE PLAN SCALE: 1 s=301—O. 4 cto I cto 3 4 / 11 II I1 II II II 5 r V z CZM SETBACK LINE LINE OF NATURAL ABUTMENT 0 O LOCATION OF NEW MAINTENANCE AND WORK SHOP BUILDING 30 0 30 60 90 6 5 I 6 7 7 E D C B A REv1/3.014 1 4-24-15 SKEET RE1ASED CONSULTANTS I )( laredian Design Group Mliscen trvran Flamm% No 33 Ofornega 000 - Queen% Clew PoS Mice Box MI6 SL Thames. U.S. WgIn Wane 00804 unertone: 340.177.1600 hoc 340.777.10)1 emalt Int 0.4 Mt OrPi•S (onto rm. nt SalNY bt. V ..at WAn OOP 1441 Ow. n• nye is. oansikin paw e. .1 nu seas. a. .mecum 0.101•Pcree int outLynot 'NY un ((well si• utz PM" 10:01101, M. n tus cos.. MO lolICO la,10I war are gaol, amt.. nal OF/ armr en, s • t••• ••• LITTLE ST. JAMES MAINTENANCE AND WORKSHOP BUILDING PROJECT PARCELS A.S.0 VMS ST JAWS US.V.I DATE: 419-15 C*ASTIST K.R.B. 0.SCRED SY. K.R.B. APPRO./EOM J.P.W. PROJECT ID: 15-001 CONTRACT NC: C1.0 PARTIAL SITE PLAN EFTA01089430

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.