Skip to main content
Skip to content
Case File
efta-efta01191696DOJ Data Set 9Other

From: Ann Rodriquez

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01191696
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Ann Rodriquez To: Leighton Allenby Cc: Jeffrey Epstein <jeevacation@gmail.com>, NYC - Richard Kahn Subject: Re: Big N update Date: Tue, 18 Aug 2015 10:45:47 +0000 Inline-Images: imagel.JPG; image2JPG; image3.JPG; image4.JPG; image5.JPG; image6.JPG; image7.JPG; image8.JPG; image9.JPG; image10.JPG; imagell.JPG; imagel2.JPG; imagel 3.JPG; image14.JPG; image15.JPG; image16.JPG; imagel 7.JPG imagel.JPG image2.JPG image3.JPG image4.JPG image5.JPG image6.JPG image7.JPG image8.JPG image9.JPG image10.JPG image 1 LJPG image12.JPG imagel3.JPG imagel4.JPG 17:7:,54 EFTA01191696 2,image16.JPG 2,image17.JPG Ann R. On Aug 17, 2015, at 10:27 PM, Leighton Allenby < wrote: Boscoe, Anna and I meet with Gene Jr today to review progress of Big N. I. Boscoe will start tomorrow to finish small items so he has completed before he goes away from 9/1 to 9/13 for some minor surgery. (approx 35 hrs to complete) I. fill engines with oil and coolant 2. install new clamps and hoses where needed 3. install parts list 2. Hydraulic install completed by tomorrow and then fill system and test 3. Rebuild battery boxes - they built to large, batteries will move around - they agreed with Boscoe 4. They are finishing the plating and side plate repairs/testing the welds and re-welding where needed - looks great I. they found 12 more small areas to spot plate - no additional cost 5. Last week in August they will side and bottom sand, prime & paint Big N 6. 1st week in September launch and sea trial and make final adjustment/modifications 7. Returned to us by September 4th - to be confirmed on August 28th pictures attached Rich, As I mentioned to you Boscoe is staying on top of welders for quality of welds. He noticed and pointed out a few welds that were not correct and Gene will correct. He is looking out for Mr. Epstein. They also want to update radar and GPS - roscoe is pushing them to find someone to fix. Gene Jr said $10k to update to new Garmin - We told him to make repairs and fix - no need to replace for what we do with the barge. Leighton Allenby Director of Pro erties <wheelhouse Ljpg> <wheelhouse 2.jpg> <rebuilt engines 4.jpg> <rebuilt engines 3.jpg> <deck.jpg> <new underplating Ljpg> <new underplating 2.jpg> EFTA01191697

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Emailjeevacation@gmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,500+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.