Case File
efta-efta01223584DOJ Data Set 9OtherZorro Management, LLC
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01223584
Pages
6
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Zorro Management, LLC
49 Zorro Ranch Road, Stanley, NM 87056
Credit Card Reques Form
Date of Request:
Amount Requested:
12/02/18
813,589.00
Payee:
RMC Electric
Payee Addres
Payee Contact:
O Check box if GL coding is split
Invoice NJMemo:
GL Description:
'Wells & Water System
GL Code:
15082
GL Amount:
$13,589.00
GL Memo:
Purchase/Install VF0 for Well Pump in Well B
Invoice NJMemo:
GL Description:
GL Code:
GL Amount:
K Check box if additional pages are included
Other Notes/
Instructions:
GL Memo:
Attached E Mail Back Up
Date Approved by Manager:
Manager Signature:
12/02/18
EFTA01223584
RMC Electric
Invoice
PO Box 10645
Albuquerque, NM 87184-0645
Bill To
Zorro Ranch
49 Zone Ranch RD
Stanley NM 87056
Date
Invoice #
11/29/2018
39x
Ship To
n.
Number
Terms
Rep
Ship
Via
F 0 B
Project
11/29/2018
Quantity
Item Code
Description
Price Each
Amount
This ABS 3 Phase VFD it comes Irrigation design package. It is
a Factory pre wired package in its own Nemo 3R inclosurc
ready to install and program.
This unit will take care of most under and over voltage
problems. we will monitor voltage for a week and have records
of voltage problem to insure system will work.
3AUA0000159493
I ABB ACS550-PD-075A-2+C192,
74.8 RATED AMPS, DIMENSIONS 49 Flx 32.36 Wx 22.88 I)
- OUTDOOR RATED, NEMA 3R/UL CERTIFIED
ENCLOSURE
- PADLOCKABLE ENCLOSURE ON THE MAIN DOOR
AND
CONTROL DOOR
- ADVANCED DRIVE KEYPAD
- 4 POLE SERVICE ENTRANCE RATED DISCONNECT
- SURGE/LIGHTNING PROTECTION
- CONDENSATION HEATER
- FIAND/OFF/AUTO SELECTOR SWITCH
Total
Page 1
EFTA01223585
RMC Electric
Invoice
Bill To
702TO itallell
Date
Invoice #
11/29/2018
398
Ship To
Number
Terms
Rep
Ship
Via
F.O.B.
Project
I 1129/2018
Quantity
Item Code
Description
Price Each
Amount
- SPEED POTENTIOMETER
- PILOT LIGHTS FOR DRIVE READY, RUN AND FAULT
- CONTROL POWER TRANSFORMER WITH AN EXTRA
100VA
FOR CUSTOMER USE
- EMBEDDED MODBUS RTU (RS485) PROTOCOL
(ADDITIONAL
COMMUNICATION PROTOCOLS AVAILABLE)
I year warranty on new VFD / 2 years with certified startup
Startup, programming and training assistance available from
Lane
Electric supply.
Materials
ABB 25 HP VFD
9,000.00
9,000.00T
Materials
voltage recording
600.00
600.OOT
Materials
labor to install and program
1.500.00
1,500.007
Materials
Start up and tech support with 2 year warranty
1,600.00
1,600.001'
4 week lead time
Sales Tax
7.00%
889.00
Total
513,589.00
Page 2
EFTA01223586
12/1/2018
Devil - Fwd: ZM VD Web B
M Gmail
Fwd: ZM VD Well B
1 message
Brice Gordon
>
Fri, Nov 30. 2018 at 9:27 AM
To: Zorro Ranch
>
Zorro Ranch
From
Date: Mon, Jul 23, 2018 at 5:04 PM
Subject: ZM VD
To: Rich Kahn
Cc: Zorro Ranch
Rich
Attached for your review
Proposal for the replacement for the VFD for the Well Pump in Well B, $13,598.00
2015 Proposal for existing VFD, $13,412.00 Rogers Drilling
2015 the Well Pump for Well B was upgraded to 50 gpm 3 phase motor, in doing so a single phase to 7.5hp 3 phase VFD
was installed.
The existing drive is very susceptible to voltage fluctuation and as of date the VFD needs to be reset frequently during the
day.
This situation its making very difficult to achieve a constant water supply for domestic and irrigation proposes.
It will need to be address if we are to achieve the qty of water required under the permit E 7871.
RMC Electric sourced the company that will supply the drive and the support
The new drive is 25hp vs the existing 7.7hp drive, this will handle the power fluctuations from the power company.
Can we proceed with purchase and install
regards
Once Gordon
Stanley, NM
LSJ-GSJ, USVI
Ph: (505) 934 2809
Brice Gordon
Stanley, NM
LSJ-GSJ, USVI
Ph:
2 attachments
hepe://mtel.google.corn/maiVu/2/ik=c841321eee&view=pt&search=ellepermthld=thread-fiS3A1618565609600360784asimpl=msg-653A16185656096
1/2
EFTA01223587
Estimate
Name Address
Date
Estimate #
6/21/2018
109
7
P.O. No.
Project
Item
Description
Total
This ABB 3 Phase VFD it comes Irrigation design package. It is a Factory pre
wired package in its own Nema 3R inclosure ready to install and program.
This unit will take care of most under and over voltage problems. we will monitor
voltage for a week and have records of voltage problem to insure system will work.
3AUA0000159493
1 ABB ACS550-PD-075A-2+C192,
74.8 RATED AMPS, DIMENSIONS 49 Hx 32.36 Wx 22.88 D
- OUTDOOR RATED. NEMA 3RfUL CERTIFIED ENCLOSURE
- PADLOCICABLE ENCLOSURE ON THE MAIN DOOR AND
CONTROL DOOR
- ADVANCED DRIVE KEYPAD
- 4 POLE SERVICE ENTRANCE RATED DISCONNECT
- SURGE/LIGHTNING PROTECTION
- CONDENSATION HEATER
- HAND/OFF/AUTO SELECTOR SWITCH
- SPEED POTENTIOMETER
- PILOT LIGHTS FOR DRIVE READY. RUN AND FAULT
- CONTROL POWER TRANSFORMER WITH AN EXTRA I00VA
[Total
Page 1
EFTA01223588
Name / Address
Estimate
Date
Estimate #
6/21/2018
109
Zorro Ranch
P.O. No.
Project
Item
Description
Total
Materials
Materials
Materials
Materials
FOR CUSTOMER USE
- EMBEDDED MODBUS RTU (RS485) PROTOCOL (ADDITIONAL
COMMUNICATION PROTOCOLS AVAILABLE)
1 year warranty on new VFD / 2 years with certified startup
Startup, programming and training assistance available from Lane
Electric supply.
ABB 25 HP VFD
voltage recording
labor to install and program
Start up and tech support with 2 year warranty
4 week lead time
Sales Tax
9,000.OOT
600.OOT
1.500.OOT
1,600.001
889.00
Total
513.589.00
Page 2
EFTA01223589
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
(505) 934 2809Phone
16185656096Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.