Skip to main content
Skip to content
Case File
efta-efta01746044DOJ Data Set 10Correspondence

EFTA Document EFTA01746044

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01746044
Pages
0
Persons
0
Integrity
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Gregory Riches < > Sent: Sunday, April 26, 2015 5:34 PM To: Richard Kahn; Jeffrey Epstein Subject: Re: Artefacto's mess As I expect the deliveries from Artefacto were a chaotic mess that built to t=e disaster that Friday was. We started the deliveries on Wednesday in 2G wi=h a miss marked pair of night tables that were already delivered back in Ja=uary. Penn's pair of workers were great at moving Len's old furniture out a= the new pieces were coming in but we had to empty everything. The delivery company sent 4 men this time so they were able to do two apartm=nts at once which was 3M and I ran between floors to inspect everything before it entere= the apartments. We seemed to be off to a good start until the two teams began to struggle wi=h putting the beds together with multiple pieces and no experience in being=able to do it. They took 3 hours each and they wound up slightly damaging the one in 2G. There also was slight dam=ge to the frame of the artwork delivered because the corner cardboard prote=tors had staples facing the finish! We did not opener her living room rug because her damaged floor had not be f=xed and it smells of mold so I didn't want to put a new rug on top of that.=Meanwhile I had Tessa and Leo coordinating with me and Penn's guys to get ah=ad of the Artefacto guys by moving the chairs from BH up to 11J and this is=through a construction site because they started the kitchen renovation aga=nst my recommendation to wait until after these deliveries. We also moved a=l of the Crate and Barrel deliveries that were in 111 while Karyna's parent= were staying there into 11B so they could be distributed which Tessa start=d to do. Thursday we picked up with the 8th floor apartment A was fine with no one th=re and it went pretty smoothly because we had moved out most of what need t= be the day before. The beds still proved to slow up the progress considera=ly as did the freight elevator because the tenants use it as much as the co=tractors. Apartment H was a different story with demolition and dust happening which l=put a stop to but also having to move the refrigerator out of the hall so we could get to t=e bedroom! Karyna and I spoke about getting her mirror dresser which was the p=an. Meanwhile the deliveries now started on the 10th floor in unit B which we h=d already emptied prior and I am now running between two floors to inspect and direct. We had t= move her existing sofa out and when they brought the new sectional in it w=s a miss match set of a right handed sofa and a right handed chaise, the co=tinuation of a patten of pieces being mislabeled. I had them move the chaise to 10 N which was getting the same sectional but r=versed. Unit F was another struggle. The old furniture from the January delivery was=still there even though Sue knew we were coming and apparently Jen was taki=g the sofa but that did not happen so I had Penn's guys move it to 7j along=with all the other old furniture. She did not want the coffee table or medi= unit that everyone had seen from the beginning and were custom orders so t=ey could not be returned. As Friday began I thought we had at least turned a corner, I was sadly mista=en. The beds continued to slow them up and Penn decided to install Julia's new s=ower door on the same day. She also decide not to want the carpet for her l=ving room so we put the bedroom carpet there. Then they opened the crate fo= her console and it had a major imperfection that neither of us would accep= so it went back. They opened up another dresser and it had the same proble=s that the ones delivered in January had so I sent that back. Then Room & B=ard showed up with their curbside delivery and because of intense traffic w= had to accept on the corner of 67th and 2nd! This is when I received a cal= from Rich that Jeffrey was not happy with the coffee tables which everyone=had seen and approved from the beginning of the order. I carried on and had Penn's guys put the boxes up on 11 so I could check the= in only to discover that all 8 boxes had the same manifest on them that sa=d they were all for 11j ! I had them put in 11B to be sorted out on Monday . EFTA_R1_00039230 EFTA01746044 Meanwhile they have finally found the missing sofa for 10 N but not the corr=ct chaise for 8h... They finally get the beds together a little faster and then Sleepy's showed u= to deliver the mattress. I tried to put them off but could not because we h=d purchased them back at the beginning of February and could not postpone t=e delivery yet again. This went fine but it was chaotic because not all the=beds were together so multiple crews were coming and going at once. Then as=they start to unpack things on 11 everything went wrong. One of the coffee t=ble bases was smashed, one of the media units had a severely broken corner,=one of the Spin dining tables looked like it had been used and again the ar= works frame had staples on the finish side all of which I sent back. Yesterday I called Artefacto, Rosana would not speak to me because she was n=t feeling well and Eduardo is on vacation so I spoke to Carolina and told a=l of what happened and what is being returned. The supervisor from the deli=ery company has all of the pictures because his camera took better pictures=in the hallways. She said that the shipping manager said she inspected ever=thing personally before it left and I assured her that that had to be a lie= Now we are suppose to pick up were we left off on Friday and finish tomorrow= I sincerely hope so. Gregory Sent from my iPad > On Apr 24, 2015, at 5:10 PM, Richard Kahn wrote:=> > can you please provide a written summary and send to jee and i regarding d=livery at 301 over past 3 days > please include open items, sleepys, room and board, photos etc > in addition girls insist that you choose glass tables so i would explain t=at as well > thank you > Richard Kahn > HBRK Associates Inc. > 575 Lexington Avenue 4th Floor > New York, NY 10022 > tel 212-971-1306 > fax 646-350-0954 > cell <?xml version=.0" encoding=TF-8"b <!DOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN" "http://www.apple.com/DTDs/PropertyList-1.0.dtd"> <plist version=.0"> <dict> <key>date-last-viewed</key> <integer>0</integer> <key>date-received</key> <integer>143O069635</integer> <key>flags</key> <integer>8590195713</integer> <key>gmail-label-ids</key> <array> <integer>22</integer> <integer>2</integer> </array> <key>remote-id</key> <string>501957</string> </dict> 2 EFTA_R1_00039231 EFTA01746045 </plist> EFTA_R1_00039232 EFTA01746046

Technical Artifacts (5)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Faxfax 646-350-0954
Phone212-971-1306
Phone646-350-0954
URLhttp://www.apple.com/DTDs/PropertyList-1.0.dtd
Wire Refrefrigerator

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.