Skip to main content
Skip to content
Case File
efta-efta01752054DOJ Data Set 10Correspondence

EFTA Document EFTA01752054

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01752054
Pages
0
Persons
0
Integrity
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Brice Gordon Sent: Thursday, July 17, 2014 3:49 AM To: Jeffrey Epstein Cc: John Christensen Subject: ZDC-MH Distribution Pumps Jeffrey Update MH Distributi=n Pumps The Motor on Pump One is grounding out, causin= both control and pump issues. This was probably caused by water=from pressure valve failure. The PLC ( control module) appears to be OK at this time JCH =ave removed motor and will determine if the motor can be repaired. Estimated Lead time for new motor 2 to 3 weeks We do have a sp.re motor, but require new pump gaskets, JCH have ordered gaskets and are s=heduled to repair by Monday next week at the latest. When spare motor and gaskets are installed, system should be fully ope=ational JCH will forward their recommendati=ns for a new pump skid and controls. any concerns=please let know regards =b>Brice Gordon 1 EFTA_R1_00050513 EFTA01752054

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.