Case File
efta-efta02029505DOJ Data Set 10CorrespondenceEFTA Document EFTA02029505
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta02029505
Pages
0
Persons
0
Integrity
Loading PDF viewer...
Summary
Ask AI About This Document
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
JE Punch List — October 5 2012
1. Clean Up - make as many barge runs as necessary
2. Equipment and Vehicles
- Sell equipment
- No machinery off the island unless approved
- New seats for gators, progators, beach cleaner - on site
- Red Polaris Bike - Power Steering Module for ordered due NM — incorrect part arrived — LV sourcing in FL
- Beach cleaner —de-rust it, clean it —COMPLETE
- Lull — non-operational, estimate to complete work due 10/10
3. Computers/Phones
- Beach office — no Internet, phone, Time Clock — Jermaine working on getting cleaning products for fiber
4. Five Palms
- Furniture — outside furniture in place
to tie down cushions to resolve wind issues, completed by 10/11
- Picture frame — measurements forwarded to
- 86 x 70
- Mirrored siding — will continue to reglue — possible mural work
- Fiber —Jermaine to provide estimates for "fiber secure box"
5. Grotto
- Mattress cover — Fabric on site, work to begin 10/10
6. Berm/Top of Hill
- Hydroseed — all areas again
7. Triangle
- Must design triangle — awaiting JE direction
- Peter to remove/relocate Palm Trees — via JE direction
8. Flagpole Pool Cabana
- Furniture —desk from Paris —JE selected Fabric, swatch returned to NYC 10/6
- Clock — unit rusted — have order 2 new units - 1 for backup
- Yellow exercise poles— COMPLETE
- Auto-closer on toilet door —will add to carpentry list
- Light Parking Area — Complete, JE to review 10/5
9. Floating Dock
- Jet ski bumpers — complete — reviewing whether this type resolves the issues with the jet skis
• Table/Dock Box - Dock box top investigate possible "rubber material" other possible solution
- Dock boxes — struts should all be replaced — they are all backward — will add to carpentry list
- "walk the plank" option — review material on this & floating dock — "rubberized material"
10. Chillax Room
— Requires furniture piece for electrical/media equipment — suggestions forwarded 10/4
11. Chillax Bathroom
- require blue rugs for bathroom & vanity area — Sarah
12. Mechanical Building Transformer — on site, off pallet, reviewing installation options
13. Boats
- Lady G — sell — in hurricane storage — offer $60K via JE, Rich to negotiate pricing
- Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000
- Big N — repair — at AYH dock — 2 quotes forwarded awaiting direction
hydraulic hoses/fittings to be completed "in house", forwarded quote awaiting direction
- Inside cleaning 3 days/2 pers $720.00 supervised by Carlos, after final completion of work — approved JE
- doors/windows in progress — Complete
- cylinders/boxes — on site 10/8
14. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees
15. Transient Surge Protection — due at Tropical 10/9
EFTA_R1_00538568
EFTA02029505
16. Landscaping — Peter's List
- High road trees
- High road waterfall — details required
- Line all roads with stones
- Pop's Garden — need deer protection — Danny suggested install a motion detector with a strobe light - the deer will
activate the light/sound — JE approved 9/24 — Danny will forward 10/5
- Shade cloth — on LS1 — Peter installed one for JE review
- Clean mess, cut grass; trim all vines, acacia — owner's drive, blue beach, gym — work in progress
- Peter to clean the sides of the road — work in progress
- Bike Path - Black Heli Under Pads — not enough on site to complete project. Quote forwarded 10/5. Larry has provided
another option
- Review growth of sea grape - engineering area
- Hydroseed all pull box areas & engineering
- Take out the single tree in engineering - Peter might want to cut it, so not to damage lines
17. Roads
- General re-grading of roads — ongoing — Peter
- Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review
details with Better Roads — week of 10/8
18. Library
- AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor
19. New Employee Bathrooms
20. Gym
- New punching bag — installation of the speed bag on hold 9/22 - per JE until visit — carpenters list
- New front & back doors installation — carpenters list
21. Beach Office
- complete electrical overall required
- waterproofing/sealing/painting/replace rotten wood required
22. LSJ Mooring — Darren forwarded to Army Corp for final approval — awaiting response
23. Hangar
- Fuel Containment Pad — draft approved, drainage incorporated — survey forwarded to the architect 9/18 - he will
complete the plan by 10/5, submit to DPNR for permitting (Cecile's update as of 9/21)
24. Steel shed — Buck Steel —JE approved mock-up 9/26, changes 9/27 — Buck Steel working on the final specs/quote
25. Equipment to be Purchased
- (3) light generators — Larry as estimate
- (1) skid steer on site — require forks, ordered 10/3
- (1) John Deere box and blade — Brice has recommended JD 5101E AWD — loader, scraper, digger, 100hp, enclosed cab
- (1) man-lift
- (2) golf cars — 2 x 2 seater
- (1) dump truck — JE approved purchase — 2012 Ford F450 - $15,000 deposit sent 9/25, shipment booked at Tropical
-(1) mini excavator
• (1) Jet ski trailer
26. LSJ Mats — for all locations — ordered 9/22
27. Engineering — start emptying/relocating items in remaining 20 foot containers 10/05
28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them
29. Part Time Employees — Anna forwarded information of 2 potential part-time housekeepers to=
Neither fits
the requirement, investigating further
30. Heli Pad — Larry to order new windsock for north side of helipad
31. Cisterns — need to be cleaned and sealed work to begin 11/1
32. Solar - lights installation COMPLETE - JE does not like the "white light", likes a "soft white" light —JE to review when
on site
EFTA_R1_00538569
EFTA02029506
- Solar quote reviewed with Rich, submitted to JE 9/17 — now researching line loss on cable, awaiting update
33. Master Bedroom — door sliders require waxing and alignment — to be completed after visit
34. Beauty Machine — on site, only instruction manual is how to use the machine, not put it together. Danny believes
he can put the unit together, will work on this 10/6
EFTA_R1_00538570
EFTA02029507
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.