EFTA Document EFTA01454629
RRP72 - Southern Financlal Appendix B: Case Study #5: Theodor-Heuss-Allee - Frankfurt, Germany 24 energy and water projects Heating, Ventilating, and Air Conditioning Upgrades Electric Motors and Drives Water and Sewer Conservation Systems Commissioning Totals 2007 Baseline2 Percent of Baseline Projects' Retrofit of CRAC with VFD and controls AHU VFD Retrofit EcoLab Conveyer Dishwasher (3) RCx Optimization - RCx Optimization - RCx Optimization - RCx Optimization - RCx Optimization
Summary
RRP72 - Southern Financlal Appendix B: Case Study #5: Theodor-Heuss-Allee - Frankfurt, Germany 24 energy and water projects Heating, Ventilating, and Air Conditioning Upgrades Electric Motors and Drives Water and Sewer Conservation Systems Commissioning Totals 2007 Baseline2 Percent of Baseline Projects' Retrofit of CRAC with VFD and controls AHU VFD Retrofit EcoLab Conveyer Dishwasher (3) RCx Optimization - RCx Optimization - RCx Optimization - RCx Optimization - RCx Optimization
Ask AI About This Document
Extracted Text (OCR)
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.